kcur and the arena
- tat2kc
- Bryant Building
- Posts: 4196
- Joined: Wed Feb 19, 2003 6:32 pm
- Location: freighthouse district
- Contact:
kcur and the arena
Up to Date, at 11 am on Wednesday, will host a show discussing the arena design teams and the process. If you can't catch it, you can stream it afterwards from the website.
Are you sure we're talking about the same God here, because yours sounds kind of like a dick.
- KCPowercat
- Ambassador
- Posts: 34097
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
kcur and the arena
thanks for the heads up.
- KCPowercat
- Ambassador
- Posts: 34097
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
kcur and the arena
some highlights.
- Vicki Noltis (sp?) called in saying the public will have more say when the team is picked and the design phase starts. Tomorrow's meetings will not be much about design (as others have stated on here). This makes me feel better about the meetings. Although Collison brought up a good point that this meeting tomorrow is pretty much picking the "style" of building will be hence the meetings should be open.
- Mayor didn't want a "design contest", hence the RFQ to just hear the teams design qualifications and why they should do the arena.
- The choice will pretty much decide if this will be a KC-Identity style building or a background building.
- Gehry challenge is to show they can do a functional arena
- Caller brings up Gehry has cost overruns, time overruns, and future repairs because his joinery can be faulty.
- Vicki Noltis (sp?) called in saying the public will have more say when the team is picked and the design phase starts. Tomorrow's meetings will not be much about design (as others have stated on here). This makes me feel better about the meetings. Although Collison brought up a good point that this meeting tomorrow is pretty much picking the "style" of building will be hence the meetings should be open.
- Mayor didn't want a "design contest", hence the RFQ to just hear the teams design qualifications and why they should do the arena.
- The choice will pretty much decide if this will be a KC-Identity style building or a background building.
- Gehry challenge is to show they can do a functional arena
- Caller brings up Gehry has cost overruns, time overruns, and future repairs because his joinery can be faulty.
-
- Penntower
- Posts: 2004
- Joined: Wed Feb 05, 2003 8:03 pm
- Location: Brookside
kcur and the arena
Will we get to hear the results of the meeting? I am particularly interested in the third item.
- KCPowercat
- Ambassador
- Posts: 34097
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
kcur and the arena
3rd team?