This work had been scheduled for April. The project is 2 months behind.
OFFICIAL - Reverb (1800 Walnut)
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
- DaveKCMO
- Ambassador
- Posts: 20068
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: OFFICIAL - Reverb (1800 Walnut)
Opening in 2020. Neighborhood pushed back on the Walnut wall. Too sterile! Expect changes.
- KCtoBrooklyn
- Alameda Tower
- Posts: 1262
- Joined: Tue Jan 16, 2007 4:01 pm
Re: OFFICIAL - Reverb (1800 Walnut)
Here is what I get with increased saturation. It does get some of that turquoise tone back. But who knows.normalthings wrote: ↑Mon May 20, 2019 9:16 pmIncreased the saturation and got this. I think that we are looking at a greyish colored skin.
- KCPowercat
- Ambassador
- Posts: 34067
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
- DaveKCMO
- Ambassador
- Posts: 20068
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: OFFICIAL - Reverb (1800 Walnut)
I guess the piers for this had to be a lot deeper on the east end due to erosion (?) caused by the old Turkey Creek, which used to run down Walnut and is now under the street.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: OFFICIAL - Reverb (1800 Walnut)
IIRC, Turkey Creek eroded the base rock/clay layers and was later filed in with regular soil. Foundations on the east side had to be drilled deeper to reach past the infill.
On another note, forms for floor 1 walls are going in this week.https://twitter.com/tomgerend/status/11 ... 00256?s=21
- rxlexi
- Penntower
- Posts: 2296
- Joined: Sun Dec 14, 2003 10:30 pm
- Location: Briarcliff
Re: OFFICIAL - Reverb (1800 Walnut)
Pushback on the streetwall or the overall east facade? Still sad to me that a very attractive, distinctive building was stripped of one of its primary architectural features in that geometric, skeletal skin. Would love to see something similar come back...Opening in 2020. Neighborhood pushed back on the Walnut wall. Too sterile! Expect changes.
- smh
- Supporter
- Posts: 4332
- Joined: Tue Jun 08, 2010 10:40 pm
- Location: Central Loop
Re: OFFICIAL - Reverb (1800 Walnut)
The streetwall--which in the original design was essentially blank. Agreed that it is too bad the cool skin went away.rxlexi wrote: ↑Wed Jun 26, 2019 9:47 amPushback on the streetwall or the overall east facade? Still sad to me that a very attractive, distinctive building was stripped of one of its primary architectural features in that geometric, skeletal skin. Would love to see something similar come back...Opening in 2020. Neighborhood pushed back on the Walnut wall. Too sterile! Expect changes.
- DaveKCMO
- Ambassador
- Posts: 20068
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: OFFICIAL - Reverb (1800 Walnut)
The streetwall was the rub. They said there would be louvers or something, but they needed to compensate much more for that.
-
- Valencia Place
- Posts: 1752
- Joined: Mon May 27, 2019 4:02 am
Re: OFFICIAL - Reverb (1800 Walnut)
Lots of progress this time around!
Formwork for concrete walls and floors.
Formwork for concrete walls and floors.
-
- Valencia Place
- Posts: 1752
- Joined: Mon May 27, 2019 4:02 am
-
- Valencia Place
- Posts: 1752
- Joined: Mon May 27, 2019 4:02 am
- TheLastGentleman
- Broadway Square
- Posts: 2941
- Joined: Tue Jun 13, 2017 9:27 pm
- KCPowercat
- Ambassador
- Posts: 34067
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: OFFICIAL - Reverb (1800 Walnut)
someone's grandkid got a drone!
- taxi
- Penntower
- Posts: 2111
- Joined: Thu Feb 08, 2007 12:32 am
- Location: S. Plaza
Re: OFFICIAL - Reverb (1800 Walnut)
Love that music, too.
I need to figure out how to curate my living. Maybe move into Reverb, I suppose.
I need to figure out how to curate my living. Maybe move into Reverb, I suppose.
-
- Valencia Place
- Posts: 1752
- Joined: Mon May 27, 2019 4:02 am
Re: OFFICIAL - Reverb (1800 Walnut)
Development Plan Drawing Set - July 9th, 2019
Previously released renderings included in the new set.The façade metal pattern has changed.
- Although we liked the previous “ribbon’s” on the east façade, there arose concern between
the design build team and the client that the pattern could be dated quickly.
- While working through the metal panel details with our subcontractor partner for the
previous “ribbon” east façade, it became apparent there could be a lot of metal joints in the
pattern that could create visual disruption to the pattern.The west façade metal pattern did not change, but in reaction to the charcoal gray on the
- We concluded with a more refined approach of a charcoal gray metal panel on the east
facade that still utilized the ribbon linearity, but in a more timeless design.
east façade we went with a more reflective silver-look metal on the west façade that will modulate colors with the sun’s pattern and reflect the beauty of the mid-west’s brightly colored sunsets.
Updated the parklet design and garage screening
- After investigation of existing utilities, including an existing water line on Walnut Street, we
re-designed the parklet to create an elevated planting bed to avoid street trees on top of
water lines.
- We further established this parklet as a community amenity by designing what will be a
locally crafted wood community table accented with vegetation/ planting bed in the middle of the table.
- We provided permanent urban seating with a durable continuous concrete seating surrounding the table for use by the local community to work alone or gather with friends.
We slightly increased the size of each floor, by about 1,000 sf or less per floor.
- The new garage screening is a milled aluminum finish which we believe will add movement and nice reflections to further activate sidewalk activity.
- As we improved the east façade to a more timeless design, we introduced an extension of
20” at the 6th floor on the east façade to reflect the cantilevers on the west façade.
Increased parking from 118 parking spaces to 121.
- This was simply extending what was a partial level for the top parking deck to a full level for the top parking deck. No new levels were created.
Last edited by langosta on Sun Jul 14, 2019 2:35 pm, edited 1 time in total.
- DaveKCMO
- Ambassador
- Posts: 20068
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: OFFICIAL - Reverb (1800 Walnut)
Doesn't appear that they've incorporated the community's feedback about that Walnut facade yet. They're going to have to really overcompensate for that aluminum cladding.
-
- New York Life
- Posts: 458
- Joined: Thu Mar 17, 2016 8:41 am
Re: OFFICIAL - Reverb (1800 Walnut)
Did they agree to anything before they received their permit? Or did the neighborhood just voice displeasure?
Also their reasoning on the wave facade is some serious post-VE rationalization. “You should be glad we cut off your leg, think of how much weight you just lost!”
- DaveKCMO
- Ambassador
- Posts: 20068
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: OFFICIAL - Reverb (1800 Walnut)
No. This was PortKC, so they didn't have much public review. PortKC now requires projects to seek neighborhood feedback before they complete the incentives process.horizons82 wrote: ↑Sat Jul 13, 2019 9:27 pmDid they agree to anything before they received their permit? Or did the neighborhood just voice displeasure?
Also their reasoning on the wave facade is some serious post-VE rationalization. “You should be glad we cut off your leg, think of how much weight you just lost!”
-
- New York Life
- Posts: 458
- Joined: Thu Mar 17, 2016 8:41 am
Re: OFFICIAL - Reverb (1800 Walnut)
^Then I'd suspect the neighborhood is SOL.