Rocky Branch Creek Technology Park

Post by normalthings »

Diode Ventures is pursuing a second data center in the Northland. Across the road from Golden Plains.


Project Name: Rocky Branch Creek Technology Park
Proposed Use: Development of 5 data center buildings and 1 electrical substation needed to support.
Developmer: Diode Ventures


City Pin: 100194


Anticipated Construction Date
05/31/2023

Anticipated Completion Date
09/20/2027
cor88b
Parking Garage
Parking Garage
Posts: 25
Joined: Mon Jun 06, 2016 1:47 pm

Re: Rocky Branch Creek Technology Park

Post by cor88b »

so they are building Golden Plains technology park off 169 and across the highway they are now going to do another?
kboish
Hotel President
Hotel President
Posts: 3258
Joined: Mon Nov 26, 2007 12:25 am
Location: West Plaza

Re: Rocky Branch Creek Technology Park

Post by kboish »

They cant build these things fast enough.
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Rocky Branch Creek Technology Park

Post by earthling »

Wow, impressive if the case. No incentives for this one or seeking some kind of extension of existing?

So assuming buildings about same size as GPTP, would be near 40% addition to GPTP.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Rocky Branch Creek Technology Park

Post by normalthings »

earthling wrote: Wed Feb 02, 2022 4:16 pm Wow, impressive if the case. No incentives for this one or seeking some kind of extension of existing?

So assuming buildings about same size as GPTP, would be near 40% addition to GPTP.
"Other" incentives was marked
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Rocky Branch Creek Technology Park

Post by normalthings »

cor88b wrote: Wed Feb 02, 2022 4:07 pm so they are building Golden Plains technology park off 169 and across the highway they are now going to do another?
Yes, I suspect different tenants
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Rocky Branch Creek Technology Park

Post by normalthings »

360 acres. Expanded to 9 data center buildings.
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Rocky Branch Creek Technology Park

Post by earthling »

Image
Rocky Branch Creek is a 360-acre greenfield development just south of Smithville, Missouri and located near Golden Plains Technology Park, another hyperscale data center campus developed by Diode Ventures.

The Rocky Branch Creek development is conveniently located near the Nashua Substation and transmission lines from Evergy. The site has close access to the Kansas City water and sewer systems, too.

The property is currently zoned for mixed use, which includes data center usage, but the Diode team is pursuing new zoning to support the possibility of hyperscale data center development. Diode is also pursuing incentives for future end users.
If each building the size of a Meta DC (600K sqft each), that's potentially over 5M sqft for the Rocky Branch site. likely at least 3M.

KC fortunate to have B&V/Diode kickstarting these DC parks, prepping the infrastructure and pre-arranging incentives to make it easier for any operator to plop in. And perhaps best economic use for all of the excessive KCMO land. Will be able to go from off the radar to a top tier DC market in a fairly short period.

Wonder if this is planned to start prep in parallel to GPTP or after GPTP mostly occupied.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Rocky Branch Creek Technology Park

Post by normalthings »

earthling wrote: Sun Apr 17, 2022 5:50 am Image
Rocky Branch Creek is a 360-acre greenfield development just south of Smithville, Missouri and located near Golden Plains Technology Park, another hyperscale data center campus developed by Diode Ventures.

The Rocky Branch Creek development is conveniently located near the Nashua Substation and transmission lines from Evergy. The site has close access to the Kansas City water and sewer systems, too.

The property is currently zoned for mixed use, which includes data center usage, but the Diode team is pursuing new zoning to support the possibility of hyperscale data center development. Diode is also pursuing incentives for future end users.
If each building the size of a Meta DC (600K sqft each), that's potentially over 5M sqft for the Rocky Branch site. likely at least 3M.

KC fortunate to have B&V/Diode kickstarting these DC parks, prepping the infrastructure and pre-arranging incentives to make it easier for any operator to plop in. And perhaps best economic use for all of the excessive KCMO land. Will be able to go from off the radar to a top tier DC market in a fairly short period.

Wonder if this is planned to start prep in parallel to GPTP or after GPTP mostly occupied.
Parallel based on the timeline given. Wish they built denser. Any reasons why they don’t?
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Rocky Branch Creek Technology Park

Post by earthling »

normalthings wrote: Sun Apr 17, 2022 3:03 pm Parallel based on the timeline given. Wish they built denser. Any reasons why they don’t?
They're just conceptual renderings from Diode, the tenants could end up doing something different - Facebook layout a bit different than Diode conceptual. And layout will probably depend on number of tenants - many tenants may want more space between buildings, if a single tenant takes it all, might be denser. The capacity is also determined by water/power feeds too so it just depends.

With a 3rd park (Hampton Meadows) potentially coming there would be a lot of power draw. At some point City/Evergy might want to negotiate that larger tenants contribute to N+10% for renewables... that is N=their need and additional 10% for public use and/or potential DC overdraw on power grid, or even 5%. Should alleviate any public concerns for DC power grid impact.
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1350
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Rocky Branch Creek Technology Park

Post by alejandro46 »

earthling wrote: Mon Apr 18, 2022 8:20 am
normalthings wrote: Sun Apr 17, 2022 3:03 pm Parallel based on the timeline given. Wish they built denser. Any reasons why they don’t?
They're just conceptual renderings from Diode, the tenants could end up doing something different - Facebook layout a bit different than Diode conceptual. And layout will probably depend on number of tenants - many tenants may want more space between buildings, if a single tenant takes it all, might be denser. The capacity is also determined by water/power feeds too so it just depends.

With a 3rd park (Hampton Meadows) potentially coming there would be a lot of power draw. At some point City/Evergy might want to negotiate that larger tenants contribute to N+10% for renewables... that is N=their need and additional 10% for public use and/or potential DC overdraw on power grid, or even 5%. Should alleviate any public concerns for DC power grid impact.
While the development of these rural parcels is good, hopefully it shows that market demand for big base load users will push Evergy to invest more in renewables. They have been backtracking/beating around the bush recently.

https://kansasreflector.com/2021/09/23/ ... il%20fuels.

I am not an expert, but my understanding is base load is traditionally gas, nuclear, etc., while 'peaker' plants for high demand are filled in by intermittent renewables. In more recent years, the 'baseload' concept has shifted in some areas so now cheap renewables make up more of the base load while gas/coal/nuclear meet the peak demand due to their higher generation costs.

Evergy Integrated Resources Plan: https://www.evergy.com/-/media/document ... erview.pdf
Baseload: https://consumerenergyalliance.org/2021 ... ric-power/
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Rocky Branch Creek Technology Park

Post by earthling »

^Was under the impression Evergy was ahead of the game, not good if they are backtracking. Facebook is apparently contributing renewables to local grid so hopefully enough to stay ahead of the curve. Maybe needs to be negotiated for any significant DC operator if not doing their own renewables onsite.

Renewables have become more efficient every few years and should continue to do so... more watts per sqft of solar panels, per rotation of wind turbines, etc.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Rocky Branch Creek Technology Park

Post by normalthings »

Will Evergy need to upsize transmission lines with the KCI Industrial Park + these tech parks + KCI all feeding off the same line
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Rocky Branch Creek Technology Park

Post by earthling »

Has Rocky Branch been proposed to the City yet? Would think all of those logistics would need to be hashed out to move forward, ditto with the next one. GPTP appears to be covered infrastructure wise.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Rocky Branch Creek Technology Park

Post by normalthings »

earthling wrote: Mon Apr 18, 2022 1:36 pm Has Rocky Branch been proposed to the City yet?
yes
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Rocky Branch Creek Technology Park

Post by earthling »

^I actually mean has it been reviewed, with any incentives approved. Sorry, wrongly stated.
dukuboy1
Alameda Tower
Alameda Tower
Posts: 1031
Joined: Sat Jan 04, 2020 12:02 pm

Re: Rocky Branch Creek Technology Park

Post by dukuboy1 »

Isn't Evergy involved in the proposed giant solar farm by the airport? I assume that would help with renewable energy as that proposed solar farm would be the largest in the US and hold a top status in the world as well.
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1350
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Rocky Branch Creek Technology Park

Post by alejandro46 »

dukuboy1 wrote: Mon Apr 18, 2022 4:08 pm Isn't Evergy involved in the proposed giant solar farm by the airport? I assume that would help with renewable energy as that proposed solar farm would be the largest in the US and hold a top status in the world as well.
It's a 300 megawatts field proposed, big but definitely not the largest in the world or the US. It may be the largest at an airport, however, presumably that is what you mean. Based on a quick google, I think that would be correct.

https://constructionreviewonline.com/bi ... California.

Tallahasee has the current largest - 42 MW
https://airportimprovement.com/article/ ... -s-largest
-airport-solar-farm#:~:text=But%20the%20team%20developing%20the,for%20airport%20sited%20solar%20farms.
daGOAT
Western Auto Lofts
Western Auto Lofts
Posts: 621
Joined: Wed Apr 14, 2021 8:39 am
Location: Los Angeles, CA

Re: Rocky Branch Creek Technology Park

Post by daGOAT »

I actually had a convo with Brian Platt who told me the idea was to power neighborhoods in the northside of the city as well as some south of the river. I'm curious where this 300mw would stand relative to the midwest. From what I've experienced, and found thru research, KC gets more sun than the rest of the midwest, actually we almost get as much sun as Dallas, TX believe it or not, I would think we are the most logical midwestern city to utilize solar power.
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Rocky Branch Creek Technology Park

Post by earthling »

This shows annual sunshine, KC pretty high, nearly as high as Dallas over 2800 hours/yr. Mostly just SW has over 3000 hours/yr.
https://www.currentresults.com/Weather/ ... y-city.php

KC should also look into mini hydro power with the fast moving river (not dams). There's several low to non-evasive methods now.