Panasonic Electric Vehicle Battery Plant (Mystery Kansas 'Mega Project')

Post by Cratedigger »

From the BizJournal today:
Kansas contains one of two finalist markets competing for a mystery company's $4 billion, 3 million-square-foot advanced manufacturing facility, which promises to deliver 4,000 permanent jobs averaging $50,000 in annual pay, plus 16,551 temporary construction jobs. The state began as one of 80 respondents to a request for proposals that the company put out about 10 months ago.
https://www.bizjournals.com/kansascity/ ... oland.html

Wonder what this could be?

Maybe Garmin moving some production back stateside? Oracle Data Center?

Has anyone heard anything about this?
User avatar
Anthony_Hugo98
Valencia Place
Valencia Place
Posts: 1932
Joined: Fri Mar 22, 2019 10:50 pm
Location: Overland Park, KS

Re: Mystery Kansas 'Mega Project'

Post by Anthony_Hugo98 »

Tesla?
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Mystery Kansas 'Mega Project'

Post by normalthings »

freedog wrote: Tue Jan 25, 2022 9:12 pm From the BizJournal today:
Kansas contains one of two finalist markets competing for a mystery company's $4 billion, 3 million-square-foot advanced manufacturing facility, which promises to deliver 4,000 permanent jobs averaging $50,000 in annual pay, plus 16,551 temporary construction jobs. The state began as one of 80 respondents to a request for proposals that the company put out about 10 months ago.
https://www.bizjournals.com/kansascity/ ... oland.html

Wonder what this could be?

Maybe Garmin moving some production back stateside? Oracle Data Center?

Has anyone heard anything about this?
I doubt it's a data center. Data Centers have almost no jobs and the jobs that are created are high paying. $4 billion sounds too small to be a chip factory based on announcements. Wish it was tech-related as those drive cargo flights. I suspect it's something a bit more traditional with maybe a blend of higher tech. EV?

The head of KCADC retweeted Lt. Governor's tweet on this project so it may be KC area but not quite metro. This is one aspect of the new law that may indicate the location of the new facility.
A 50% property tax abatement for firms and suppliers located in a foreign-trade zone. (Kansas has two zones — in the Kansas City area (New Century) and Wichita.)
Aerospace?
Toland did not identify the company's industry but described it as a "perfect fit" with Kansas' strategic growth plans. Factoring in both the manufacturing facility and suppliers that could co-locate nearby, the state could reap $2.5 billion annually in direct and indirect benefits, according to an economic impact study the Commerce Department commissioned.
Last edited by normalthings on Tue Jan 25, 2022 9:46 pm, edited 3 times in total.
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Mystery Kansas 'Mega Project'

Post by earthling »

Electric vehicle, battery or less complex chip plant, like RAM or something less complex than a CPU.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Mystery Kansas 'Mega Project'

Post by normalthings »

earthling wrote: Tue Jan 25, 2022 9:41 pm Electric vehicle, battery or less complex chip plant, like RAM or something less complex than a CPU.
Micron is looking for a memory factory. Price stage $40 billion.
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Mystery Kansas 'Mega Project'

Post by earthling »

Ah, I've seen $7B, which is more in the ballpark. Depends on what it's used for and production capacity.
https://www.yahoo.com/now/micron-build- ... 43077.html

But yeah, based on number of jobs it sounds more like an electric vehicle plant. OTOH, there is a US drive to be less dependent on Asia for chips.

edit: Just looked up Tesla battery plants and they are about 800-1000 employees.
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1351
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Mystery Kansas 'Mega Project'

Post by alejandro46 »

Tesla just is finishing up Giga Austin. They have indicated desire for an additional plan in the US to serve east coast. I don't think Kansas would work for them. They almost located in Oklahoma.

Similarly, Rivian just announced a new plant in Georgia. $5bln, 7500 jobs. Lucid won't build another new plant stateside for awhile. Ford just announced a bunch of new EV initiatves in Kentucky and TN to support F150 EV. Not sure on GM or Stellantis, I guess it could be them. Seems more likely aerospace or some other type of highly technical manufacturing I'll never be able to guess. Huge deal size though.
User avatar
AlkaliAxel
Broadway Square
Broadway Square
Posts: 2948
Joined: Wed Jun 16, 2021 9:58 pm
Location: West Plaza

Re: Mystery Kansas 'Mega Project'

Post by AlkaliAxel »

But if this thing goes to like anywhere in Kansas east of Topeka then it becomes irrelevant to us right
User avatar
Cratedigger
Valencia Place
Valencia Place
Posts: 1814
Joined: Thu Dec 02, 2021 3:32 pm

Re: Mystery Kansas 'Mega Project'

Post by Cratedigger »

The Kansas Senate passed the economic incentive bill aiming to get this project. Called the Attracting Powerful Economic Expansion Act.

Moves to the House now
kcjak
Penntower
Penntower
Posts: 2429
Joined: Thu Nov 29, 2007 3:02 pm

Re: Mystery Kansas 'Mega Project'

Post by kcjak »

It says Kansas is one of two finalists...what is the other state?
dukuboy1
Alameda Tower
Alameda Tower
Posts: 1031
Joined: Sat Jan 04, 2020 12:02 pm

Re: Mystery Kansas 'Mega Project'

Post by dukuboy1 »

Would be great if it were a chip/battery/tech type of plant. Hope it’s in KC Metro to use at the 2 auto plants and our central location. & transportation & logistics infrastructure already in space. Fingers crossed this goes within the metro
User avatar
Cratedigger
Valencia Place
Valencia Place
Posts: 1814
Joined: Thu Dec 02, 2021 3:32 pm

Re: Mystery Kansas 'Mega Project'

Post by Cratedigger »

Heard a rumor it would be in a Foreign Trade Zone which would mean KC or Wichita
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1351
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Mystery Kansas 'Mega Project'

Post by alejandro46 »

freedog wrote: Tue Feb 01, 2022 9:52 am Heard a rumor it would be in a Foreign Trade Zone which would mean KC or Wichita
I believe this is not a rumor, see tweet the KCADC retweeted from the Lt. Governor's referenced above. I agree that it makes some sense for a chip fab or battery factory. Ohio recently landed a huge Intelt plan, and they can be built anywhere but they need a lot of cheap green electricity and water. KS has plenty of wind turbines and water resources.
https://time.com/6140476/intel-building-factory-ohio/

What about the Sunflower Ammo Plant site? It's about cleaned up within the next couple years and a huge contiguous parcel ready for development. I don't think it's the most likelky, just because of the work still needed to be done but maybe if they had a megaproject ready to go the final remediation process would be expedited.
User avatar
Cratedigger
Valencia Place
Valencia Place
Posts: 1814
Joined: Thu Dec 02, 2021 3:32 pm

Re: Mystery Kansas 'Mega Project'

Post by Cratedigger »

https://www.bizjournals.com/kansascity/ ... 2022-02-01

Speculation from the KCBJ today. Mentions the possibility of an electric vehicle battery manufacturing plant linked to a joint venture of LG and the automaker Stellantis.

Also highlights the Sunflower Ammo Plant as a potential site.
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1351
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Mystery Kansas 'Mega Project'

Post by alejandro46 »

Article also notes that average pay of $50k of then new project is below average for aerospace industry, so that is less likely to be behind the project.

They didn't mention a chip FAB. I think Stellantis makes sense for a battery factory in KC area. They don't have any presence here, all their factories and located in Michigan, Indiana, Ohio and one in IL, but we have plenty of rail and highway links to those factories plus to ports and raw material processing plants at ports and domestically. As of now, we import all lithium from places like Chile and Australia but new mines are hopefully opening soon in Nevada and North Carolina. Stellantis has announced two upcomming battery plants one with LG (40 GWh) and one with Samsung SDI (23 GWh) but not named where they would be built as of now.

I don't know if they would want to build out west in KS simply because there's less potential applicants. KC already has a significant automotive talent pool from Fairfax and Claycomo.

Tesla has had issues hiring people for their Sparks NV gigafactory due to long commute and the fact that Reno is so small (total metro -425k population).
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1351
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Mystery Kansas 'Mega Project'

Post by alejandro46 »

For reference, Tesla-Panasonic GigaNevada has output of 24 GWh in 2021 and employeed 7000 people. It's not fully complete, instead with new battery factories being constructed on-premises in Austin.



Image
User avatar
KCPowercat
Ambassador
Posts: 33839
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: Mystery Kansas 'Mega Project'

Post by KCPowercat »

I couldn't be more underwhelmed with this being called some mega project if it's in fact a battery plant.
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: Mystery Kansas 'Mega Project'

Post by earthling »

^Does it matter what the product is as long as it's not controversial? A $4B investment with 4K+ jobs isn't peanuts.
User avatar
KCPowercat
Ambassador
Posts: 33839
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: Mystery Kansas 'Mega Project'

Post by KCPowercat »

tell me what the jobs pay and I'm more likely to agree.
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1351
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Mystery Kansas 'Mega Project'

Post by alejandro46 »

Average pay is $50k so about $24 bucks an hour plus benefits.

We need a lot more batteries in the coming decades, why not here? We actually have some cobalt in Missouri. (https://www.mocobalt.com/) and we have MO S&T. Will stay tuned to see what it is. Not a done deal, still have to beat Oklahoma. They almost landed the Tesla factory deal that went to Austin, so it wouldn't be surprising if they are the frontrunners.