Okay, well I hope so.earthling wrote: ↑Thu Jun 30, 2022 11:00 am ^Pretty sure it's value of early phases, not entire project but it seems to vary by project. Some show entire valuation in early phases. And not even sure if this site is correct but they charge a pretty penny for the data and they do seem to get a lot of projects right.
Americo Plaza Tower (Former Holiday Inn)
Re: Americo Plaza Tower (Former Holiday Inn)
Re: Americo Plaza Tower (Former Holiday Inn)
Yes agreed with GRID, this is really "the" prime site in the city right now IMO - anything less than a signature project (ideally tower) of some sort is a fail. This is highly visible, highly accessible, amazing views and nestled among KC's cultural treasures. Really hoping these features are taken advantage of...
Re: Americo Plaza Tower (Former Holiday Inn)
I thought they had a plan and then ran out of money funding the demo.GRID wrote: ↑Thu Jun 30, 2022 11:01 am Jesus. So this prime site is going from what would have been a high end hotel which failed then a to high rise tower that probably would have cost 100-200 million to a shitty 14 million dollar sprawl project that will probably include a motel and drive through restaurants by the sound of it. I mean the land needs to remain vacant. Another case of tearing shit down before you have a real plan to develop.
- TheLastGentleman
- Broadway Square
- Posts: 2932
- Joined: Tue Jun 13, 2017 9:27 pm
Re: Americo Plaza Tower (Former Holiday Inn)
I don't think it's possible for the team behind this project to run out of money.shinatoo wrote: ↑Thu Jun 30, 2022 11:36 amI thought they had a plan and then ran out of money funding the demo.GRID wrote: ↑Thu Jun 30, 2022 11:01 am Jesus. So this prime site is going from what would have been a high end hotel which failed then a to high rise tower that probably would have cost 100-200 million to a shitty 14 million dollar sprawl project that will probably include a motel and drive through restaurants by the sound of it. I mean the land needs to remain vacant. Another case of tearing shit down before you have a real plan to develop.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Americo Plaza Tower (Former Holiday Inn)
Believe they had a real plan and financing but the construction cost spike lead into the interest rate spike and we can’t forgot the end of incentives.
Re: Americo Plaza Tower (Former Holiday Inn)
Grid couldn't have said it better.
-
- Parking Garage
- Posts: 15
- Joined: Tue May 24, 2022 6:43 pm
Re: Americo Plaza Tower (Former Holiday Inn)
Moving dirt here today...Did this project get approved?
https://www.flickr.com/photos/19656694 ... 860T54U79E
https://www.flickr.com/photos/19656694 ... 860T54U79E
Last edited by NEgoofyfoot on Tue Sep 20, 2022 1:25 pm, edited 1 time in total.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Americo Plaza Tower (Former Holiday Inn)
No development plans. Attach a photo?
-
- Parking Garage
- Posts: 15
- Joined: Tue May 24, 2022 6:43 pm
Re: Americo Plaza Tower (Former Holiday Inn)
I tried but got an error "Sorry, the board attachment quota has been reached."
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Americo Plaza Tower (Former Holiday Inn)
Upload photot to IMGUR, Flickr, etc and then post the link hereNEgoofyfoot wrote: ↑Tue Sep 20, 2022 10:10 am I tried but got an error "Sorry, the board attachment quota has been reached."
- Highlander
- City Center Square
- Posts: 10209
- Joined: Mon Jun 28, 2004 1:40 pm
- Location: Houston
Re: Americo Plaza Tower (Former Holiday Inn)
What was the most recent development proposal for this site? All I get out of the discussion above is "a shitty 14 million dollar sprawl project that will probably include a motel and drive through restaurants".
-
- Mark Twain Tower
- Posts: 8519
- Joined: Sun Sep 11, 2011 2:27 pm
- Location: milky way, orion arm
Re: Americo Plaza Tower (Former Holiday Inn)
The $14M number is likely first phase. Someone emotionally overreacted as typical. Hotel is the last indicator. Over $100M residential was the first target, so who knows with Americo.
- Cratedigger
- Valencia Place
- Posts: 1859
- Joined: Thu Dec 02, 2021 3:32 pm
Re: Americo Plaza Tower (Former Holiday Inn)
Just drove by, can confirm. One guy in a bulldozer working on the south side of the siteNEgoofyfoot wrote: ↑Tue Sep 20, 2022 10:10 am I tried but got an error "Sorry, the board attachment quota has been reached."
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Americo Plaza Tower (Former Holiday Inn)
Might just be fixing the grading.Cratedigger wrote: ↑Tue Sep 20, 2022 12:29 pmJust drove by, can confirm. One guy in a bulldozer working on the south side of the siteNEgoofyfoot wrote: ↑Tue Sep 20, 2022 10:10 am I tried but got an error "Sorry, the board attachment quota has been reached."
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Americo Plaza Tower (Former Holiday Inn)
No plans or permitsnormalthings wrote: ↑Tue Sep 20, 2022 12:37 pmMight just be fixing the grading.Cratedigger wrote: ↑Tue Sep 20, 2022 12:29 pmJust drove by, can confirm. One guy in a bulldozer working on the south side of the siteNEgoofyfoot wrote: ↑Tue Sep 20, 2022 10:10 am I tried but got an error "Sorry, the board attachment quota has been reached."
-
- Mark Twain Tower
- Posts: 8519
- Joined: Sun Sep 11, 2011 2:27 pm
- Location: milky way, orion arm
Re: Americo Plaza Tower (Former Holiday Inn)
The chances of nothing happening on this prime lot is zero. But hopefully it's the right project in context to streetcar TOD, which most developers based in KC are clueless of. It actually might be better if nothing happens until after streetcar opens but would be great if they can make it work beforehand. Construction will be a challenge with both going on.
Re: Americo Plaza Tower (Former Holiday Inn)
That's easy to say, but this lot has been empty forever.earthling wrote: ↑Tue Sep 20, 2022 12:43 pm The chances of nothing happening on this prime lot is zero. But hopefully it's the right project in context to streetcar TOD, which most developers based in KC are clueless of. It actually might be better if nothing happens until after streetcar opens but would be great if they can make it work beforehand. Construction will be a challenge with both going on.
https://www.google.com/maps/@39.0471406 ... a=!3m1!1e3
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Americo Plaza Tower (Former Holiday Inn)
Owner has no interest in selling that lot.GRID wrote: ↑Tue Sep 20, 2022 12:52 pmThat's easy to say, but this lot has been empty forever.earthling wrote: ↑Tue Sep 20, 2022 12:43 pm The chances of nothing happening on this prime lot is zero. But hopefully it's the right project in context to streetcar TOD, which most developers based in KC are clueless of. It actually might be better if nothing happens until after streetcar opens but would be great if they can make it work beforehand. Construction will be a challenge with both going on.
https://www.google.com/maps/@39.0471406 ... a=!3m1!1e3
Also, is that where the Hyatt was proposed in the 90's
- Chris Stritzel
- Penntower
- Posts: 2372
- Joined: Sun Feb 19, 2017 9:27 pm
Re: Americo Plaza Tower (Former Holiday Inn)
Knowing that the economy is a bit wobbly right now, I’d say patience is key with this one. I imagine this will be a big one when the time comes, but for now there are too many variables that might be giving the development team pause. Variables like the economy, whether or not Block’s Highrise on Madison will begin construction, 4711 Belleview, and the streetcar’s impact on development patterns are all at play here.
I have no doubts that this company had plans drawn up to see what was possible and can revise those plans dependent on the variables.