Ballasted? So railroad ties on a crushed stone bed?
This small stretch (and the potential extension to the casino) would be a nice place to do the grass covered track beds seen in Europe.
This small stretch (and the potential extension to the casino) would be a nice place to do the grass covered track beds seen in Europe.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Streetcar to the riverfront
That’s what the 30% drawings show. Grass is even more expensive than embedded so this VE’d line would never spring for it.Critical_Mass wrote: ↑Sun Jan 10, 2021 2:17 am Ballasted? So railroad ties on a crushed stone bed?
This small stretch (and the potential extension to the casino) would be a nice place to do the grass covered track beds seen in Europe.
I personally prefer the ballasted aesthetic. I worry that a grass track would not be properly respected in the park environment.
- KCPowercat
- Ambassador
- Posts: 34034
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Streetcar to the riverfront
When my mind flipped this extension from being a riverfront detour to just elongating the single line with the current loop turning into a divided path it is making a lot more sense.
-
- Mark Twain Tower
- Posts: 9862
- Joined: Tue Jul 17, 2012 7:54 am
Re: Streetcar to the riverfront
For a park environment ballasted makes sense.normalthings wrote: ↑Sun Jan 10, 2021 2:57 amThat’s what the 30% drawings show. Grass is even more expensive than embedded so this VE’d line would never spring for it.Critical_Mass wrote: ↑Sun Jan 10, 2021 2:17 am Ballasted? So railroad ties on a crushed stone bed?
This small stretch (and the potential extension to the casino) would be a nice place to do the grass covered track beds seen in Europe.
I personally prefer the ballasted aesthetic. I worry that a grass track would not be properly respected in the park environment.
Stone in a park could be the difference in safety for more people. It demarcs the line better from the park.
Imagine a small child isn't paying attention while walking back to their car. Now imagine they're vision impaired and can't see to the side. (Had a middle school student teacher in this situation, he could see forward only) Their cane will hit the ballast and they'll find the track much quicker than with stone.
People who are vision impaired will sometimes get help to learn a new environment prior to independent travel, so they can be guided that stone means danger in that spot.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Streetcar to the riverfront
https://www.kcata.org/procurement/kcata ... -extension
Final Design Consultant RFP:
Final Design Consultant RFP:
If funding becomes available, the Consultant will be asked to design another possible half-mile extension
of the streetcar line from the Riverfront station to the I-35 bridge area. This additional work will be
completed under an amendment to this contract.
- KCPowercat
- Ambassador
- Posts: 34034
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Streetcar to the riverfront
Great to see that
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Streetcar to the riverfront
RF Station 1 will be at Parcel 13/Union. RF Station 2 will be infront of the volleyball courts. Current phase will build out just to Station 1. Resolution to approve the streetcar extension agreement was approved by the Port Board.
- alejandro46
- Alameda Tower
- Posts: 1357
- Joined: Fri Feb 02, 2018 11:24 pm
- Location: King in the North(Land)
Re: Streetcar to the riverfront
Great news thanks for the update!
-
- Mark Twain Tower
- Posts: 9862
- Joined: Tue Jul 17, 2012 7:54 am
Re: Streetcar to the riverfront
Three years to operations, nice!
- KCPowercat
- Ambassador
- Posts: 34034
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Streetcar to the riverfront
Is the extension to the casino being built with the rest of the first phase dead?
- DaveKCMO
- Ambassador
- Posts: 20063
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: Streetcar to the riverfront
That will require additional funding.KCPowercat wrote: ↑Tue Mar 23, 2021 10:16 am Is the extension to the casino being built with the rest of the first phase dead?
- KCPowercat
- Ambassador
- Posts: 34034
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Streetcar to the riverfront
I understand that, I guess my question is the plan far enough along that if funding came in now they still wouldn't be part of this construction plan that opens in 24?
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Streetcar to the riverfront
I think Phase 2 is to the east end of Berkley Riverfront Park (volleyball and F&B). Isle of Capri is kinda out there in space.KCPowercat wrote: ↑Tue Mar 23, 2021 10:16 am Is the extension to the casino being built with the rest of the first phase dead?
Phase 1 is 30% designed. Expansions past Phase 1 aren't being designed just yet but the final design contract has an option for them to be included.
- DaveKCMO
- Ambassador
- Posts: 20063
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: Streetcar to the riverfront
Even if we were granted an earmark tomorrow there's no way to know if the openings could or should align because the additional extension has had very little design work completed and depends very much on what the casino and PortKC plan to do with the land they control over there (not to mention the MoDOT complication -- which is always a complication).
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Streetcar to the riverfront
Am I correct in saying that they are moveing to design an further extension of the streetcar along the riverfront?
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Streetcar to the riverfront
Port KC is launching Phase 2 of the riverfront streetcar extension. With much of the streetcar land under LOI or in discussions and stimulus coming up, they want to go ahead and get the ball rolling.
Approved: Plan and engineer study to a Phase 2 riverfront extension.
Approved: Plan and engineer study to a Phase 2 riverfront extension.
- DaveKCMO
- Ambassador
- Posts: 20063
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: Streetcar to the riverfront
This would work well with an extension of the Riverfront Heritage Trail to connect with the Blue River Trail system.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
- DaveKCMO
- Ambassador
- Posts: 20063
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: Streetcar to the riverfront
Perhaps in preparation for regional funding, as the TDD model used downtown and midtown doesn't translate to other parts of the region.normalthings wrote: ↑Mon Apr 26, 2021 9:42 pmShould we expect any other streetcar studies moving forward soon?
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Streetcar to the riverfront
Interesting. Sounded like this project was being advanced ahead of stimulus so wasn't sure if there were others like that in the works.DaveKCMO wrote: ↑Mon Apr 26, 2021 9:45 pmPerhaps in preparation for regional funding, as the TDD model used downtown and midtown doesn't translate to other parts of the region.normalthings wrote: ↑Mon Apr 26, 2021 9:42 pmShould we expect any other streetcar studies moving forward soon?