Re: Phase Three Streetcar Expansion
You want embedded track because it’s more reliable in a climate like ours.
- alejandro46
- Alameda Tower
- Posts: 1358
- Joined: Fri Feb 02, 2018 11:24 pm
- Location: King in the North(Land)
Re: Phase Three Streetcar Expansion
This is good news.
As much as I love the 9-hwy at grade proposal, would hate to spend $14m on more roads then have to rip them all up 5-10 years later to install streetcar tracks. Need to have a balance to not needlessly delay a good project while at the same time set us up for a good platform to install tracks in the near future.
Even if the regional streetcar studies didn't result in a regional plan approved by voters, at least now we are thinking hard about development in these areas that are ripe for streetcar expansion in the future (or at least, I hope so).
See Northrail, Independence Avenue.
As much as I love the 9-hwy at grade proposal, would hate to spend $14m on more roads then have to rip them all up 5-10 years later to install streetcar tracks. Need to have a balance to not needlessly delay a good project while at the same time set us up for a good platform to install tracks in the near future.
Even if the regional streetcar studies didn't result in a regional plan approved by voters, at least now we are thinking hard about development in these areas that are ripe for streetcar expansion in the future (or at least, I hope so).
See Northrail, Independence Avenue.
-
- Mark Twain Tower
- Posts: 9862
- Joined: Tue Jul 17, 2012 7:54 am
Re: Phase Three Streetcar Expansion
It wouldn't be the worst idea for KC and NKC to partner with modot to do major bridge maintenance and lay track at the same time.
The bridge is 33 years old so we're heading to the point modot might be interested in a maintenance project with multiple sources of federal match
The track has a 40 year lifespan, give or take, the bridge might need work again about the time the track needs work
The bridge is 33 years old so we're heading to the point modot might be interested in a maintenance project with multiple sources of federal match
The track has a 40 year lifespan, give or take, the bridge might need work again about the time the track needs work
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Phase Three Streetcar Expansion
More northrail photos:
Last edited by normalthings on Mon Oct 12, 2020 4:49 pm, edited 1 time in total.
- Chris Stritzel
- Penntower
- Posts: 2388
- Joined: Sun Feb 19, 2017 9:27 pm
Re: Phase Three Streetcar Expansion
^The Burlington dedicated option seemed like the best idea.
-
- Mark Twain Tower
- Posts: 9862
- Joined: Tue Jul 17, 2012 7:54 am
Re: Phase Three Streetcar Expansion
Burlington needs real signal priority too. This is one street with plenty of capacity but it's a crawl at peak use. The system will change a light to green while the next block is still 90% full in all three lanes. Off peak it's six lanes of empty concrete and can be just as fast as taking I-35 or 169 into downtown.Chris Stritzel wrote: ↑Mon Oct 12, 2020 3:47 pm ^The Burlington dedicated option seemed like the best idea.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Phase Three Streetcar Expansion
Austin voters backed a $7 billion transit package funded by property taxes and a huge bond sale for trails, bike lanes, vision zero, and roads. My understanding is that voters were asked to dedicate 8.75 cents of the city's property tax rate to mass transit.
Nashville and now Austin have proposed $1 billion + downtown tunnels. Austin's is expected to cost as much as $2 billion. KC could use the Northloop as a pre-dug transit tunnel in the future.
Trains: 2 light rail lines, an additional commuter line, a downtown transit tunnel for LRT
Bus: 7 BRT Routes
Nashville and now Austin have proposed $1 billion + downtown tunnels. Austin's is expected to cost as much as $2 billion. KC could use the Northloop as a pre-dug transit tunnel in the future.
Trains: 2 light rail lines, an additional commuter line, a downtown transit tunnel for LRT
Bus: 7 BRT Routes
- DaveKCMO
- Ambassador
- Posts: 20064
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: Phase Three Streetcar Expansion
Tom Gerend presented to the city of NKC council tonight on potential for streetcar north of the river: https://www.youtube.com/watch?v=9Hn7P5g-0KQ
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Phase Three Streetcar Expansion
Its a great watch. NKC sounds like they really want this and ready to get the conversation going again. @davekcmo Is there a serious chance that NorthRail is revisited?
- alejandro46
- Alameda Tower
- Posts: 1358
- Joined: Fri Feb 02, 2018 11:24 pm
- Location: King in the North(Land)
Re: Phase Three Streetcar Expansion
There is an opportunity to align NorthRail expansion with 169 bridge replacement/Hwy 9 at grade/North Loop removal that could fundamentally change and improve Columbus Park, River Market and North Kansas City along a walkable activated Burlington/9 Hwy. I know the City of NKC has historically indicated support. With a more rail friendly Biden admin, it's great to come in with another shovel ready project ready to go get federal funding. Reviewing the North Rail study again, I think the amount of development, both breweries and impending apartments in NKC, helps bolster the previous ratings for development potential. Also, now that Buck ONeil Bridge is being replaced, I wonder if it's better to run center running lines all the way down Burlington due to the underutilization of the road. Not sure what the point of diversion to the rail ROW right after Burlington is.
In the council meeting, NKC asks what next steps are but it's not really clear what Tom was saying as they kind of ran short of time beyond ensuring streetcar is included in master plan. I think firstly, NKC needs to run an updated study and finalize route/costs. Secondly, line up local funding through a TDD of some kind. Third, work with MODOT and submit federal and state funding.
In the council meeting, NKC asks what next steps are but it's not really clear what Tom was saying as they kind of ran short of time beyond ensuring streetcar is included in master plan. I think firstly, NKC needs to run an updated study and finalize route/costs. Secondly, line up local funding through a TDD of some kind. Third, work with MODOT and submit federal and state funding.
-
- Valencia Place
- Posts: 1721
- Joined: Mon May 27, 2019 4:02 am
Re: Phase Three Streetcar Expansion
NKC Rail by 2030?DaveKCMO wrote: ↑Tue Nov 17, 2020 8:43 pm Tom Gerend presented to the city of NKC council tonight on potential for streetcar north of the river: https://www.youtube.com/watch?v=9Hn7P5g-0KQ
- Major KC Fan
- Strip mall
- Posts: 190
- Joined: Sat Jul 11, 2009 2:20 pm
Re: Phase Three Streetcar Expansion
Hope so if the numbers work!
-
- Valencia Place
- Posts: 1721
- Joined: Mon May 27, 2019 4:02 am
Re: Phase Three Streetcar Expansion
Let’s get that Linwood Stadiums extension up and going by 2030! Streetcar has dramatically changed the way we as a region view transit. We need to keep going. No reason to stop the party at UMKC.
- DaveKCMO
- Ambassador
- Posts: 20064
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: Phase Three Streetcar Expansion
Most likely scenario -- barring a major regional investment beyond what anyone is expecting -- is BRT to the stadiums (but it might end up being higher spec than what we've built thus far).
What do you think about a NKC-to-downtown-KCK line intersecting with the river-to-UMKC line?
-
- Valencia Place
- Posts: 1721
- Joined: Mon May 27, 2019 4:02 am
Re: Phase Three Streetcar Expansion
Interesting that you all are going that route.DaveKCMO wrote: ↑Wed Dec 09, 2020 9:05 pmMost likely scenario -- barring a major regional investment beyond what anyone is expecting -- is BRT to the stadiums (but it might end up being higher spec than what we've built thus far).
What do you think about a NKC-to-downtown-KCK line intersecting with the river-to-UMKC line?
NKC to KCK is interesting. Seems like a lot of $$$$ to cross WB just to end in downtown KCK. Makes sense if the idea is to get Clay and WyCo to take the “trail head” and run with it. Otherwise I’d think NKC - RM - Independence Ave would make more sense.
- chaglang
- Bryant Building
- Posts: 4132
- Joined: Wed Jan 04, 2012 12:44 pm
Re: Phase Three Streetcar Expansion
Seems like the lines not intersecting would be a huge miss.
- DaveKCMO
- Ambassador
- Posts: 20064
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: Phase Three Streetcar Expansion
They would have to. You can't really get to KCK from NKC without intersecting the main line (probably at 12th), unless you run it like a trolley boat!
You would take advantage of the NKC and 12th Street analysis that already exists, and probably carry it through the West Bottoms since you'll never pry that I-70 structure away from KDOT.
-
- Strip mall
- Posts: 110
- Joined: Tue Jul 07, 2020 9:23 pm
Re: Phase Three Streetcar Expansion
A route that looks something like this? I like the idea of serving Quality Hill + Convention Center + East Village (cough Royals).I did not realize funding was available for this sort of thingDaveKCMO wrote: ↑Wed Dec 09, 2020 9:43 pmThey would have to. You can't really get to KCK from NKC without intersecting the main line (probably at 12th), unless you run it like a trolley boat!
You would take advantage of the NKC and 12th Street analysis that already exists, and probably carry it through the West Bottoms since you'll never pry that I-70 structure away from KDOT.
- alejandro46
- Alameda Tower
- Posts: 1358
- Joined: Fri Feb 02, 2018 11:24 pm
- Location: King in the North(Land)
Re: Phase Three Streetcar Expansion
Walker wrote: ↑Wed Dec 09, 2020 9:52 pmA route that looks something like this? I like the idea of serving Quality Hill + Convention Center + East Village (cough Royals).I did not realize funding was available for this sort of thingDaveKCMO wrote: ↑Wed Dec 09, 2020 9:43 pmThey would have to. You can't really get to KCK from NKC without intersecting the main line (probably at 12th), unless you run it like a trolley boat!
You would take advantage of the NKC and 12th Street analysis that already exists, and probably carry it through the West Bottoms since you'll never pry that I-70 structure away from KDOT.
Jerry Moran (Sen-KS) congratulates KCStreetcar on successful Phase 2 grant award.
Obviously not much, but good to have support across the state line.
It would be interesting to gauge support/feasibility for streetcar travel to other inner ring suburbs like downtown Mission and Overland Park. Last study I remember was that JoCo commuter rail study from 2004 or something. KCK is most obvious expansion though, but like NKC river crossings will undoubtedly prove expensive. I feel like having two states bidding together works to our advantage. A line from NKC to KCK would be fantastic, I would be interested to see engineering studies done on Central Bridge and up along 7th st. vs. James bridge more direct to downtown route. Central bridge is 4 lane and has the cool double decker under-truss.
Any funding is definitely an issue, and would have to be approved by voters. Either some kind of larger area TDD or citywide assessment I think for a smaller city like NKC or KCK to have local match for this, and hope state(s) kick in money for river crossing and feds invest as well.
- beautyfromashes
- One Park Place
- Posts: 7290
- Joined: Mon Mar 21, 2005 11:04 am
Re: Phase Three Streetcar Expansion
Why would we want to connect with Overland Park? Sure, they get connection to a vibrant DT for entertainment and jobs. What do we get?