Re: New Broadway Bridge

Post by DaveKCMO »

MoDOT and KCMO provided a preview of the upcoming environmental study for a new bridge. Besides the required "No Build" option, there are three that all provide bike/ped access and a direct connection to I-35. An online public meeting should launch next week.

Image

The price range is $260 million for the West Alternative and $190 million for the Adjacent Alternative. Property, street grid, and ramp impacts vary. The maps they showed were too small and the room was too dark, but you'll see them soon!
User avatar
grovester
Oak Tower
Oak Tower
Posts: 4560
Joined: Thu Mar 13, 2008 7:30 pm
Location: KC Metro

Re: New Broadway Bridge

Post by grovester »

And what was Dave's opinion?
User avatar
DaveKCMO
Ambassador
Posts: 20042
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: New Broadway Bridge

Post by DaveKCMO »

grovester wrote: Fri Aug 09, 2019 9:29 pm And what was Dave's opinion?
I'm going to need to see more details. The "Adjacent" Alternative doesn't actually have the "direct connection to I-35" that I thought (I was corrected this evening), so I guess I'd have to pick the West or Central alternatives, which I'm sure MoDOT will say they can't afford.
User avatar
grovester
Oak Tower
Oak Tower
Posts: 4560
Joined: Thu Mar 13, 2008 7:30 pm
Location: KC Metro

Re: New Broadway Bridge

Post by grovester »

Yes, I was worried about the price tag spread leading to the wrong alternative.
flyingember
Mark Twain Tower
Mark Twain Tower
Posts: 9862
Joined: Tue Jul 17, 2012 7:54 am

Re: New Broadway Bridge

Post by flyingember »

Survey is linked from here

https://www.modot.org/buck-oneil-enviro ... ic-meeting

Pay attention, you can select multiple options in the survey for each question and it will make you fix this.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: New Broadway Bridge

Post by normalthings »

flyingember wrote: Thu Aug 15, 2019 1:53 pm Survey is linked from here

https://www.modot.org/buck-oneil-enviro ... ic-meeting

Pay attention, you can select multiple options in the survey for each question and it will make you fix this.
I wish that North Loop removal was being taken into consideration with this project and the east side interstate project.
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: New Broadway Bridge

Post by earthling »

I understand the desire to shut down N Loop but it's hard to imagine S Loop handling all the traffic from various freeways feeding into downtown, especially through traffic as KC metro and region grows. And a largest freight center in US that continues to grow.

Instead, how about removing N Loop ramps and turn N Loop into just a downtown bypass for through traffic. And if it can be funded, dig it a bit deeper and build over it. Maybe have one access that's for buses only - free buses hopefully someday!
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: New Broadway Bridge

Post by normalthings »

earthling wrote: Thu Aug 15, 2019 3:25 pm I understand the desire to shut down N Loop but it's hard to imagine S Loop handling all the traffic from various freeways feeding into downtown, especially through traffic as KC metro and region grows. And a largest freight center in US that continues to grow.

Instead, how about removing N Loop ramps and turn N Loop into just a downtown bypass for through traffic. And if it can be funded, dig it a bit deeper and build over it. Maybe have one access that's for buses only - free buses hopefully someday!
I would be okay with that... MoDot should at least take a stab at a few "alternatives"
User avatar
KCPowercat
Ambassador
Posts: 33833
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: New Broadway Bridge

Post by KCPowercat »

Traffic modeling says not a big impact. It gets shut down all the time for big wrecks and doesn't seem to be the end of the world?
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: New Broadway Bridge

Post by earthling »

That's for now, what about 10, 20+ years as region grows.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: New Broadway Bridge

Post by normalthings »

earthling wrote: Thu Aug 15, 2019 4:27 pm That's for now, what about 10, 20+ years.
My observation is that most of our distribution centers are being added along or outside of I435.

Highway removal should be about improving the lives of those living along the highway, not about adding 30 seconds to the commute of those living in far flung suburbs or truck drivers traveling the country.
User avatar
KCPowercat
Ambassador
Posts: 33833
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: New Broadway Bridge

Post by KCPowercat »

earthling wrote: Thu Aug 15, 2019 4:27 pm That's for now, what about 10, 20+ years as region grows.

It considered future state. 2040 specifically. It's all at beyondtheloopkc.com
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: New Broadway Bridge

Post by earthling »

Ah thanks. Is a lot to go through. Does it show impact to S Loop with different assumptions of # of vehicles per day today, in 10 years, 20 years, etc? And factor increase in wait time to exits because now there would be fewer exits? Not clear where that study is.

The convergence of several freeways to just S Loop doesn't sound intuitively manageable but would give it benefit of doubt MODot thinks through this. If N Loop were turned into a no ramp bypass with development over it, would appease those of us wanting to contiguously tie RM back into CBD as well as take away any concerns of increasing auto traffic in future. Seems to be most ideal solution that should at least be studied as an alternative if not already.
User avatar
KCPowercat
Ambassador
Posts: 33833
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: New Broadway Bridge

Post by KCPowercat »

Removing exits on North loop and is going to impact exit wait time the same right? I don't think removal of north loop exits would honestly change anything that much, they aren't heavily used now
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: New Broadway Bridge

Post by earthling »

Removing the N Loop exits would allow burying as a bypass and allow easier contiguous development between RM and CBD.
User avatar
KCPowercat
Ambassador
Posts: 33833
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: New Broadway Bridge

Post by KCPowercat »

Right but it would also add the same load you were worried about to downtown exits right?
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: New Broadway Bridge

Post by earthling »

However less traffic to S Loop if N Loop still in use as a bypass. Getting rid of N Loop entirely doubles down traffic for S Loop long term. Just suggesting it should be studied as an alternative. Though if metro wide free bus can be pulled off....
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1350
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: New Broadway Bridge

Post by alejandro46 »

If I recall, the additional time would be like 7 minutes at max.

If MODOT removes several exits along I670, we can mitigate this. i'm very annoyed that MODOT has taken all that BeyondTheLoop worked for and threw it in the shredder.
flyingember
Mark Twain Tower
Mark Twain Tower
Posts: 9862
Joined: Tue Jul 17, 2012 7:54 am

Re: New Broadway Bridge

Post by flyingember »

So much of the peak use slowdown comes from bad ramp access. For example, removing the backups onto Broadway from I-35 will help as many people go faster as the north loop removal would lead to going slower.

It would encourage more traffic to take 670 to 35 for example.

Related, theres plenty of capacity along Truman. Downtown is designed for traffic in the morning to come from the south so shifting the focus to that direction could work better.

That’s why looking at the total picture is important.
User avatar
TheLastGentleman
Broadway Square
Broadway Square
Posts: 2910
Joined: Tue Jun 13, 2017 9:27 pm

Re: New Broadway Bridge

Post by TheLastGentleman »

alejandro46 wrote: Thu Aug 15, 2019 8:02 pmi'm very annoyed that MODOT has taken all that BeyondTheLoop worked for and threw it in the shredder.
Is BeyondTheLoop not involved in this?