multi-unit buildings take way longer than a single family home. they can spend as much time fishing conduit between two floors as it takes to drill and caulk a single family home. I saw the pace of the google fiber install in the multi-use building I'm in. walked around with the guy who controls the condos for our part. spent an hour just identifying the backbone path. then when they built conduit to it on the outside they spent hours at thatearthling wrote:^The rate is pretty slow. I'm in Westport zip and still don't have it. They have my building wired but not my unit yet even though schedule was for last Fall. Will be surprising if they complete N/S KCMO by end of 2015, but would be good news if they can perk the pace up.
they've already promised to pick up the pace and have the cable all installed by the end of the year. they're well into neighborhood conduit install