Re: We are getting a new airport!!!

Posted: Thu Jan 14, 2021 12:30 pm
by normalthings
KCPowercat wrote: Wed Jan 13, 2021 11:06 pmWhy?
Rental car companies are hurting badly and they would have to sign off on (pay for) the APM

Re: We are getting a new airport!!!

Posted: Thu Jan 14, 2021 12:52 pm
by Major KC Fan
The new airport terminal won’t be completed for several years and the article implies that the transit system is projected for several years after that. We should know by the end of this year just how effective the vaccination effort against COVID will be.
Once we get back to “normal” and hopefully restart the economy, whatever rental car companies are left will be needed if travel returns to normal patterns. I actually think travel could explode due to pent up demand. I know we are eager to travel again. At that point the transit system could become a reality. We just need to study and plan now for the anticipated uptick.

Re: We are getting a new airport!!!

Posted: Thu Jan 14, 2021 1:20 pm
by alejandro46
Major KC Fan wrote: Thu Jan 14, 2021 12:52 pm The new airport terminal won’t be completed for several years and the article implies that the transit system is projected for several years after that. We should know by the end of this year just how effective the vaccination effort against COVID will be.
Once we get back to “normal” and hopefully restart the economy, whatever rental car companies are left will be needed if travel returns to normal patterns. I actually think travel could explode due to pent up demand. I know we are eager to travel again. At that point the transit system could become a reality. We just need to study and plan now for the anticipated uptick.
I agree, I think travel will rebound within the next year or two due to a lot of pent up demand and vaccination. I know savings rate of American households has been going up with everyone staying home.

The distance from the new terminal to the rental car facility is a mile-ish. I would also highly encourage the KCI team to use standard gauge rail versus a mono-rail type APM so that this can serve as a trailhead for a longer transit route to the airport in the decades down the road.

Re: We are getting a new airport!!!

Posted: Thu Jan 14, 2021 8:21 pm
by Sani
alejandro46 wrote: Thu Jan 14, 2021 1:20 pm I would also highly encourage the KCI team to use standard gauge rail versus a mono-rail type APM so that this can serve as a trailhead for a longer transit route to the airport in the decades down the road.
I don't know if it would make a huge difference to have the system coordinate with any future light rail, like MetroLink in St. Louis, or if the APM was an entirely separate system, like AirTrain at JFK or SFO. If the intra-airport transit is going to have multiple stations at the Rental Car Center, terminal, economy parking, etc., then having it as part of the light rail system means you have to make it free within the airport and then confirm fares are collected for any travel beyond the airport, assuming we can't do the fare-free setup on that system like we have for the Streetcar.

Re: We are getting a new airport!!!

Posted: Fri Jan 15, 2021 10:08 am
by flyingember
Sani wrote: Thu Jan 14, 2021 8:21 pm I don't know if it would make a huge difference to have the system coordinate with any future light rail, like MetroLink in St. Louis, or if the APM was an entirely separate system, like AirTrain at JFK or SFO. If the intra-airport transit is going to have multiple stations at the Rental Car Center, terminal, economy parking, etc., then having it as part of the light rail system means you have to make it free within the airport and then confirm fares are collected for any travel beyond the airport, assuming we can't do the fare-free setup on that system like we have for the Streetcar.
Free fare zones are done on other systems. I have 100% confidence that any future shared transit system at the airport could handle this well.
Take rail out of the picture, running city busses as a common system could work the same way.

Here's one example
https://www.rideuta.com/Fares-And-Passes/Free-Fare-Zone

Re: We are getting a new airport!!!

Posted: Fri Jan 15, 2021 5:03 pm
by Sani
flyingember wrote: Fri Jan 15, 2021 10:08 amFree fare zones are done on other systems. I have 100% confidence that any future shared transit system at the airport could handle this well.
Take rail out of the picture, running city busses as a common system could work the same way.

Here's one example
https://www.rideuta.com/Fares-And-Passes/Free-Fare-Zone
It's definitely doable, no question. I guess I'm wondering if the higher cost of an airport system that is standard light rail vs. an APM would make it less likely to get anything built at all. But no one ever accused me of being an optimist.

Re: We are getting a new airport!!!

Posted: Fri Jan 15, 2021 6:21 pm
by normalthings
Facebook photo dump from the past few weeks.

Last Y column installed
MEP install ongoing
Drywall has started

https://www.facebook.com/pg/BuildKCI/ph ... e_internal

Head House
Image

Image

Image

The dark steel will hold up the full height glass facade. That bit of horizontal steel at the bottom of the photo is the vestibule canopy.
Image

https://www.facebook.com/media/set/?van ... 7708267455

Image

Image

Image

Image

Re: We are getting a new airport!!!

Posted: Mon Jan 18, 2021 2:21 am
by normalthings
Runway 1L is going to be rebuilt. This will become the main runway once the new terminal opens.

Re: We are getting a new airport!!!

Posted: Mon Jan 18, 2021 7:19 am
by earthling
This is going up much faster than I expected. Is it ahead of schedule? How many on-site workers, peak concurrent.

Re: We are getting a new airport!!!

Posted: Mon Jan 18, 2021 10:47 am
by Sani
normalthings wrote: Mon Jan 18, 2021 2:21 am Runway 1L is going to be rebuilt. This will become the main runway once the new terminal opens.
What's the timeframe on that? I can see from the satellite view that 1R/19L was rebuilt sometime in the last few years.

Re: We are getting a new airport!!!

Posted: Mon Jan 18, 2021 1:50 pm
by normalthings
Sani wrote: Mon Jan 18, 2021 10:47 am
normalthings wrote: Mon Jan 18, 2021 2:21 am Runway 1L is going to be rebuilt. This will become the main runway once the new terminal opens.
What's the timeframe on that? I can see from the satellite view that 1R/19L was rebuilt sometime in the last few years.
Bidding now. Hope to get it done before the terminal opens.

Re: We are getting a new airport!!!

Posted: Mon Jan 18, 2021 7:43 pm
by flyingember
earthling wrote: Mon Jan 18, 2021 7:19 am This is going up much faster than I expected. Is it ahead of schedule? How many on-site workers, peak concurrent.

I’m guessing how ahead/behind they are at this point became irrelevant since the opening date would have been picked based upon the current status, and they announced than on Dec 9, 2020

At that point the calendar would have been effectively reset. Before it was always “early 2023” which could be Jan to April or so.

Re: We are getting a new airport!!!

Posted: Tue Jan 19, 2021 5:39 pm
by normalthings
normalthings wrote: Fri Oct 16, 2020 7:57 pm
Image
Steel for the lounge is going up

Re: We are getting a new airport!!!

Posted: Tue Jan 26, 2021 12:09 am
by Anthony_Hugo98
https://open.spotify.com/episode/7dzQvU ... jsOFkHLu9A

Justin Meyer & David Long of the Aviation department interviewing for the Airport Experience podcast. Not much new information, but they go in depth pretty well into the project.

Re: We are getting a new airport!!!

Posted: Thu Jan 28, 2021 3:19 pm
by normalthings

Re: We are getting a new airport!!!

Posted: Thu Jan 28, 2021 3:26 pm
by KCPowercat
Heather will be happy let's hope

Re: We are getting a new airport!!!

Posted: Thu Jan 28, 2021 3:31 pm
by WoodDraw
This is really cool, but they should have an airlock where the kids come out and are just soaked in disinfectant lol

Re: We are getting a new airport!!!

Posted: Thu Jan 28, 2021 4:05 pm
by kboish
The glass on the control tower looks cheap.

Re: We are getting a new airport!!!

Posted: Thu Jan 28, 2021 8:15 pm
by normalthings
KCPowercat wrote: Thu Jan 28, 2021 3:26 pm Heather will be happy let's hope
She loves it!

An interesting stat that touches on the complexity of the new terminal project: The MEP team alone had to address ~7,000 conflicts during design.

Re: We are getting a new airport!!!

Posted: Thu Feb 04, 2021 5:35 pm
by normalthings
Image

Shows you the scale of things