MoDOT and KCMO provided a preview of the upcoming environmental study for a new bridge. Besides the required "No Build" option, there are three that all provide bike/ped access and a direct connection to I-35. An online public meeting should launch next week.
The price range is $260 million for the West Alternative and $190 million for the Adjacent Alternative. Property, street grid, and ramp impacts vary. The maps they showed were too small and the room was too dark, but you'll see them soon!
The price range is $260 million for the West Alternative and $190 million for the Adjacent Alternative. Property, street grid, and ramp impacts vary. The maps they showed were too small and the room was too dark, but you'll see them soon!
- grovester
- Oak Tower
- Posts: 4574
- Joined: Thu Mar 13, 2008 7:30 pm
- Location: KC Metro
Re: New Broadway Bridge
And what was Dave's opinion?
- DaveKCMO
- Ambassador
- Posts: 20064
- Joined: Sun Nov 27, 2005 6:22 pm
- Location: Crossroads
- Contact:
Re: New Broadway Bridge
I'm going to need to see more details. The "Adjacent" Alternative doesn't actually have the "direct connection to I-35" that I thought (I was corrected this evening), so I guess I'd have to pick the West or Central alternatives, which I'm sure MoDOT will say they can't afford.
- grovester
- Oak Tower
- Posts: 4574
- Joined: Thu Mar 13, 2008 7:30 pm
- Location: KC Metro
Re: New Broadway Bridge
Yes, I was worried about the price tag spread leading to the wrong alternative.
-
- Mark Twain Tower
- Posts: 9862
- Joined: Tue Jul 17, 2012 7:54 am
Re: New Broadway Bridge
Survey is linked from here
https://www.modot.org/buck-oneil-enviro ... ic-meeting
Pay attention, you can select multiple options in the survey for each question and it will make you fix this.
https://www.modot.org/buck-oneil-enviro ... ic-meeting
Pay attention, you can select multiple options in the survey for each question and it will make you fix this.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: New Broadway Bridge
I wish that North Loop removal was being taken into consideration with this project and the east side interstate project.flyingember wrote: ↑Thu Aug 15, 2019 1:53 pm Survey is linked from here
https://www.modot.org/buck-oneil-enviro ... ic-meeting
Pay attention, you can select multiple options in the survey for each question and it will make you fix this.
-
- Mark Twain Tower
- Posts: 8519
- Joined: Sun Sep 11, 2011 2:27 pm
- Location: milky way, orion arm
Re: New Broadway Bridge
I understand the desire to shut down N Loop but it's hard to imagine S Loop handling all the traffic from various freeways feeding into downtown, especially through traffic as KC metro and region grows. And a largest freight center in US that continues to grow.
Instead, how about removing N Loop ramps and turn N Loop into just a downtown bypass for through traffic. And if it can be funded, dig it a bit deeper and build over it. Maybe have one access that's for buses only - free buses hopefully someday!
Instead, how about removing N Loop ramps and turn N Loop into just a downtown bypass for through traffic. And if it can be funded, dig it a bit deeper and build over it. Maybe have one access that's for buses only - free buses hopefully someday!
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: New Broadway Bridge
I would be okay with that... MoDot should at least take a stab at a few "alternatives"earthling wrote: ↑Thu Aug 15, 2019 3:25 pm I understand the desire to shut down N Loop but it's hard to imagine S Loop handling all the traffic from various freeways feeding into downtown, especially through traffic as KC metro and region grows. And a largest freight center in US that continues to grow.
Instead, how about removing N Loop ramps and turn N Loop into just a downtown bypass for through traffic. And if it can be funded, dig it a bit deeper and build over it. Maybe have one access that's for buses only - free buses hopefully someday!
- KCPowercat
- Ambassador
- Posts: 34045
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: New Broadway Bridge
Traffic modeling says not a big impact. It gets shut down all the time for big wrecks and doesn't seem to be the end of the world?
-
- Mark Twain Tower
- Posts: 8519
- Joined: Sun Sep 11, 2011 2:27 pm
- Location: milky way, orion arm
Re: New Broadway Bridge
That's for now, what about 10, 20+ years as region grows.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: New Broadway Bridge
My observation is that most of our distribution centers are being added along or outside of I435.
Highway removal should be about improving the lives of those living along the highway, not about adding 30 seconds to the commute of those living in far flung suburbs or truck drivers traveling the country.
- KCPowercat
- Ambassador
- Posts: 34045
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
-
- Mark Twain Tower
- Posts: 8519
- Joined: Sun Sep 11, 2011 2:27 pm
- Location: milky way, orion arm
Re: New Broadway Bridge
Ah thanks. Is a lot to go through. Does it show impact to S Loop with different assumptions of # of vehicles per day today, in 10 years, 20 years, etc? And factor increase in wait time to exits because now there would be fewer exits? Not clear where that study is.
The convergence of several freeways to just S Loop doesn't sound intuitively manageable but would give it benefit of doubt MODot thinks through this. If N Loop were turned into a no ramp bypass with development over it, would appease those of us wanting to contiguously tie RM back into CBD as well as take away any concerns of increasing auto traffic in future. Seems to be most ideal solution that should at least be studied as an alternative if not already.
The convergence of several freeways to just S Loop doesn't sound intuitively manageable but would give it benefit of doubt MODot thinks through this. If N Loop were turned into a no ramp bypass with development over it, would appease those of us wanting to contiguously tie RM back into CBD as well as take away any concerns of increasing auto traffic in future. Seems to be most ideal solution that should at least be studied as an alternative if not already.
- KCPowercat
- Ambassador
- Posts: 34045
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: New Broadway Bridge
Removing exits on North loop and is going to impact exit wait time the same right? I don't think removal of north loop exits would honestly change anything that much, they aren't heavily used now
-
- Mark Twain Tower
- Posts: 8519
- Joined: Sun Sep 11, 2011 2:27 pm
- Location: milky way, orion arm
Re: New Broadway Bridge
Removing the N Loop exits would allow burying as a bypass and allow easier contiguous development between RM and CBD.
- KCPowercat
- Ambassador
- Posts: 34045
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: New Broadway Bridge
Right but it would also add the same load you were worried about to downtown exits right?
-
- Mark Twain Tower
- Posts: 8519
- Joined: Sun Sep 11, 2011 2:27 pm
- Location: milky way, orion arm
Re: New Broadway Bridge
However less traffic to S Loop if N Loop still in use as a bypass. Getting rid of N Loop entirely doubles down traffic for S Loop long term. Just suggesting it should be studied as an alternative. Though if metro wide free bus can be pulled off....
- alejandro46
- Alameda Tower
- Posts: 1357
- Joined: Fri Feb 02, 2018 11:24 pm
- Location: King in the North(Land)
Re: New Broadway Bridge
If I recall, the additional time would be like 7 minutes at max.
If MODOT removes several exits along I670, we can mitigate this. i'm very annoyed that MODOT has taken all that BeyondTheLoop worked for and threw it in the shredder.
If MODOT removes several exits along I670, we can mitigate this. i'm very annoyed that MODOT has taken all that BeyondTheLoop worked for and threw it in the shredder.
-
- Mark Twain Tower
- Posts: 9862
- Joined: Tue Jul 17, 2012 7:54 am
Re: New Broadway Bridge
So much of the peak use slowdown comes from bad ramp access. For example, removing the backups onto Broadway from I-35 will help as many people go faster as the north loop removal would lead to going slower.
It would encourage more traffic to take 670 to 35 for example.
Related, theres plenty of capacity along Truman. Downtown is designed for traffic in the morning to come from the south so shifting the focus to that direction could work better.
That’s why looking at the total picture is important.
It would encourage more traffic to take 670 to 35 for example.
Related, theres plenty of capacity along Truman. Downtown is designed for traffic in the morning to come from the south so shifting the focus to that direction could work better.
That’s why looking at the total picture is important.
- TheLastGentleman
- Broadway Square
- Posts: 2937
- Joined: Tue Jun 13, 2017 9:27 pm
Re: New Broadway Bridge
Is BeyondTheLoop not involved in this?alejandro46 wrote: ↑Thu Aug 15, 2019 8:02 pmi'm very annoyed that MODOT has taken all that BeyondTheLoop worked for and threw it in the shredder.