Three Light

Come here for discussion about the new downtown entertainment district.
User avatar
normalthings
Penntower
Penntower
Posts: 2046
Joined: Mon Mar 30, 2015 9:52 pm

Re: Three Light

Post by normalthings » Tue Oct 01, 2019 12:27 am

CONSTRUCTION START: November 2019 CONSTRUCTION END: May, 2021
331’6” from grade to roof.

Found this on CompassKC. Add 10-20 feet for the glassed in rooftop mechanical floor(s)
Last edited by normalthings on Tue Oct 01, 2019 9:59 am, edited 2 times in total.

langosta
Strip mall
Strip mall
Posts: 193
Joined: Mon May 27, 2019 4:02 am

Re: Three Light

Post by langosta » Tue Oct 01, 2019 12:42 am

Image

Looks like this will open late May or early June 2021. Permitting will be done in phases allowing the design to remain flexible and to speed things up I assume.

User avatar
TheLastGentleman
Alameda Tower
Alameda Tower
Posts: 1159
Joined: Tue Jun 13, 2017 9:27 pm

Re: Three Light

Post by TheLastGentleman » Tue Oct 01, 2019 4:09 pm

Rumor has it that construction is actually starting Q1 of 2020

STLguy1
Strip mall
Strip mall
Posts: 154
Joined: Sat Feb 24, 2007 11:13 pm
Location: Overland Park

Re: Three Light

Post by STLguy1 » Wed Oct 02, 2019 6:39 pm

TheLastGentleman wrote:
Tue Oct 01, 2019 4:09 pm
Rumor has it that construction is actually starting Q1 of 2020
So not in November now?

User avatar
TheLastGentleman
Alameda Tower
Alameda Tower
Posts: 1159
Joined: Tue Jun 13, 2017 9:27 pm

Re: Three Light

Post by TheLastGentleman » Wed Oct 02, 2019 7:05 pm

STLguy1 wrote:
Wed Oct 02, 2019 6:39 pm
So not in November now?
That’s just what I’ve heard. Hopefully it changes

langosta
Strip mall
Strip mall
Posts: 193
Joined: Mon May 27, 2019 4:02 am

Re: Three Light

Post by langosta » Sun Oct 13, 2019 2:40 pm

The Three Light Final Development Plan was failed by the City. It shouldn't take to long for Cordish to provide the requested info.

Image

Plan Corrections: The following are recommended by the Public Works - Transportation Department.

1) A traffic impact study is required. Please submit a scope to Jeff Bryan for review.


The following are recommended by Christopher Hughey.
1) Provide a detail / elevations of the sky bridge between Two Light and Three Light.
2) Add unit square footages to the tenant spaces and lobby area on the ground floor (sheet L1.0) or add a floor plan sheet of this content.
3) Recommend adding renderings similar to ones provided where they are larger in size and more closely zoomed into the actual building.
4) Provide a spec sheet, detail, or photo example of the screening materials for the parking garage levels.
5) Label all exterior building materials and colors.
6) Recommend adding an architectural feature or art piece on the shared demising wall on the north elevation.
7) The last sheet just says "Insert Building Exterior Lighting Plan if Available". Revise as needed.
8) Show or elaborate on where the short and long term bicycle parking spaces will be located.
9) Provide a detail on how the roof top mechanical units will be screened. See Section 88-425-08-D.

Preliminary Conditions of Approval
1) The developer shall submit an affidavit, completed by a landscape architect licensed in the State of Missouri, verifying that all landscaping required of the approved plan has been installed in accordance with the plan and is healthy prior to Certificate of Occupancy.

The following are recommended by Jimmi Lossing.
1) Money in lieu of parkland for 2019 shall be based on the following formula: (# multi-family units) X (2 persons per unit) X (0.006 acres per person)=acres of parkland required X 2019 parkland fee per acre) = Fee.
2) The developer shall submit a streetscape plan with street tree planting plan per 88-425-03 for approval and permitting by the Parks & Recreation Department’s Forestry Division prior to beginning work in the public right-of-way

The following are recommended by Steven Zuhlke.
1) Obtain inspection approval of grease interceptor, sand/oil interceptor, sampling manhole, and associated piping from the Regulatory Compliance Division of Water Services Department (816-513-0600) prior to issuance of a temporary certificate of occupancy

User avatar
normalthings
Penntower
Penntower
Posts: 2046
Joined: Mon Mar 30, 2015 9:52 pm

Re: Three Light

Post by normalthings » Thu Oct 31, 2019 4:34 pm

TheLastGentleman wrote:
Tue Oct 01, 2019 4:09 pm
Rumor has it that construction is actually starting Q1 of 2020
Yes.