OFFICIAL: Port Authority Riverfront Project

Issues concerning Downtown as described by the Downtown Council. River to 31st Street, I-35 to Bruce R. Watkins.
User avatar
Anthony_Hugo98
Valencia Place
Valencia Place
Posts: 1973
Joined: Fri Mar 22, 2019 10:50 pm
Location: Overland Park, KS

Re: OFFICIAL: Port Authority Riverfront Project

Post by Anthony_Hugo98 »

normalthings wrote: Thu Jul 15, 2021 10:58 pm Kansas will throw abatement, CID, and a redirection of sales tax at anything that can qualify it seems. Missouri suburbs pretty readily throw CID and abatement. Construction and residents will follow the path of least resistance, inside or out of the city limits. Absurdly low highway drive times are not in our (downtown) favor.

Back to subject: No indication the Isle of Capri project will ask for incentives. They are pretty close to starting construction and incentives would take some time to get approved.
They haven’t really made an indication that they’d want to pursue them. They also seem to be really inclined to get the streetcar down there, so I imagine most of their effort in trying to persuade any entity would be in regards to streetcar extension. Just my perception so far
User avatar
DaveKCMO
Ambassador
Posts: 20062
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: OFFICIAL: Port Authority Riverfront Project

Post by DaveKCMO »

I can tell you for sure that sales tax redirection is quite a thing. KCATA loses $6 million a year from TIFs still on the books -- almost enough to have funded zero fare! -- and no one is calculating how much gets directed in these EATs deals because they're often short term (like just construction materials).
shinatoo
Ambassador
Posts: 7424
Joined: Wed Jan 19, 2005 3:20 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by shinatoo »

DaveKCMO wrote: Fri Jul 16, 2021 8:44 am I can tell you for sure that sales tax redirection is quite a thing. KCATA loses $6 million a year from TIFs still on the books -- almost enough to have funded zero fare! -- and no one is calculating how much gets directed in these EATs deals because they're often short term (like just construction materials).
So how much longer before those TIFs start coming off the books? And how many of those projects will still be viable taxpayers after their TIF ends?
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by normalthings »

DaveKCMO wrote: Fri Jul 16, 2021 8:44 am I can tell you for sure that sales tax redirection is quite a thing. KCATA loses $6 million a year from TIFs still on the books -- almost enough to have funded zero fare! -- and no one is calculating how much gets directed in these EATs deals because they're often short term (like just construction materials).
I was trying to reference the STAR bond program specifically which is Kansas only.


Articles seem to confirm a casino ground breaking is imminent. I had seen some construction stuff onsite last month but will check again this weekend.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by normalthings »

Grading plan for the soccer facility submitted
flyingember
Mark Twain Tower
Mark Twain Tower
Posts: 9862
Joined: Tue Jul 17, 2012 7:54 am

Re: OFFICIAL: Port Authority Riverfront Project

Post by flyingember »

Sales tax abatements, rather than a special tax for a district, are immensely stupid.

2021 budget income for KC:

Earnings Tax: $292.3 million
Sales taxes: $258.5 million
Property taxes: $166.5 million
Utility (?): $111.8 million
Convention: $57.7 million

The KCATA gets 7/8% and the city gets 2%
So the city's losses to redirection would be about $13 million.

That's about 1.5% of the budget. Not insignificant.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by normalthings »

Port KC confirmed no incentives for the project. Not sure how or why that even came up here?
User avatar
beautyfromashes
One Park Place
One Park Place
Posts: 7278
Joined: Mon Mar 21, 2005 11:04 am

Re: OFFICIAL: Port Authority Riverfront Project

Post by beautyfromashes »

shinatoo wrote: Fri Jul 16, 2021 9:02 am
DaveKCMO wrote: Fri Jul 16, 2021 8:44 am I can tell you for sure that sales tax redirection is quite a thing. KCATA loses $6 million a year from TIFs still on the books -- almost enough to have funded zero fare! -- and no one is calculating how much gets directed in these EATs deals because they're often short term (like just construction materials).
So how much longer before those TIFs start coming off the books? And how many of those projects will still be viable taxpayers after their TIF ends?
Takes money to make money.
langosta
Valencia Place
Valencia Place
Posts: 1612
Joined: Mon May 27, 2019 4:02 am

Re: OFFICIAL: Port Authority Riverfront Project

Post by langosta »

langosta wrote: Thu Jul 08, 2021 5:31 pm
TheLastGentleman wrote: Thu Jul 08, 2021 5:19 pm
langosta wrote: Thu Jul 08, 2021 1:51 pmSuper easy to replace and a lot that wasnt going to be redeveloped this decade.
How do you know that?
An RV was blown up in that area last week.
What?
If there was a good chance that there was a higher and better use likely in the coming years, Port KC wouldn’t be building soccer fields on it.


June 29th, 2021. The remains of an RV were found on the east side of the Riverfront area.

Image
Sounds like another suspicious vehicle was found at the RF today. Reddit reporting Union and riverfront area put on lockdown with 2+ items removed by the bomb squad. Not finding many details outside of Reddit.
User avatar
Chris Stritzel
Penntower
Penntower
Posts: 2359
Joined: Sun Feb 19, 2017 9:27 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by Chris Stritzel »

Riverfront Streetcar Extension screenshots...
Image
Image
Image
User avatar
Critical_Mass
Colonnade
Colonnade
Posts: 996
Joined: Sun Jun 13, 2004 7:56 pm
Location: Union Hill

Re: OFFICIAL: Port Authority Riverfront Project

Post by Critical_Mass »

I like the purple route option from the second image. Berkley Pkwy is wide enough they could have one side of the boulevard dedicated to the the streetcar and convert the other side to two way traffic. I think they were looking at ways to road diet / slow the cars here anyway with on street parking. This would achieve that.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by normalthings »

Critical_Mass wrote: Thu Jul 29, 2021 2:21 pm I like the purple route option from the second image. Berkley Pkwy is wide enough they could have one side of the boulevard dedicated to the the streetcar and convert the other side to two way traffic. I think they were looking at ways to road diet / slow the cars here anyway with on street parking. This would achieve that.
Purple would be faster. 45mph road speed vs <10 in the park.

Green is what you are describing. I like the idea but feel like dedicated center lanes may be the most efficient.
flyingember
Mark Twain Tower
Mark Twain Tower
Posts: 9862
Joined: Tue Jul 17, 2012 7:54 am

Re: OFFICIAL: Port Authority Riverfront Project

Post by flyingember »

normalthings wrote: Thu Jul 29, 2021 4:42 pm
Critical_Mass wrote: Thu Jul 29, 2021 2:21 pm I like the purple route option from the second image. Berkley Pkwy is wide enough they could have one side of the boulevard dedicated to the the streetcar and convert the other side to two way traffic. I think they were looking at ways to road diet / slow the cars here anyway with on street parking. This would achieve that.
Purple would be faster. 45mph road speed vs <10 in the park.
Not exactly a place to use speed as a reason for one route vs the other. You're talking about roughly one minute vs two minutes. When purple requires signals to get into mixed traffic, you're probably talking about no difference or street running is slower.

Those speeds aren't all that different when the stops might be half a mile apart. Full acceleration takes 15 seconds at 45mph and it takes 66 seconds to travel between stops. the longer deceleration at 45mph means it's not going to be above 10mph as long as you think, maybe 20 seconds total.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by normalthings »

All of the northern routes will require a signal to hop off the road and into the park. Southern route (purple) won’t require stopping and starting for pedestrians crossing the travks
flyingember
Mark Twain Tower
Mark Twain Tower
Posts: 9862
Joined: Tue Jul 17, 2012 7:54 am

Re: OFFICIAL: Port Authority Riverfront Project

Post by flyingember »

normalthings wrote: Mon Aug 02, 2021 7:46 pm All of the northern routes will require a signal to hop off the road and into the park. Southern route (purple) won’t require stopping and starting for pedestrians crossing the travks
Purple has two signals required. One to re-enter the row at the west end WB since the road drops to two lanes there, and one to cross traffic WB at the east end
User avatar
FangKC
City Hall
City Hall
Posts: 18215
Joined: Sat Jul 26, 2003 10:02 pm
Location: Old Northeast -- Indian Mound

Re: OFFICIAL: Port Authority Riverfront Project

Post by FangKC »

The Business Journal is reporting that Isle of Capri's name will now be Bally's Kansas City Casino. Groundbreaking on the renovation will be August 18.

Bally's goes all in on name as groundbreaking nears for $40M redevelopment of former Isle of Capri property

https://www.bizjournals.com/kansascity/ ... 2021-08-03
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by normalthings »

FangKC wrote: Tue Aug 03, 2021 12:16 pm The Business Journal is reporting that Isle of Capri's name will now be Bally's Kansas City Casino. Groundbreaking on the renovation will be August 18.

Bally's goes all in on name as groundbreaking nears for $40M redevelopment of former Isle of Capri property

https://www.bizjournals.com/kansascity/ ... 2021-08-03
Permit with "asian gaming" in the name was filed. Any idea what that may be
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by normalthings »

flyingember wrote: Tue Aug 03, 2021 7:53 am
normalthings wrote: Mon Aug 02, 2021 7:46 pm All of the northern routes will require a signal to hop off the road and into the park. Southern route (purple) won’t require stopping and starting for pedestrians crossing the travks
Purple has two signals required. One to re-enter the row at the west end WB since the road drops to two lanes there, and one to cross traffic WB at the east end
Northern Routes: 1 major conflict at the west end where route jumps north. 8 medium conflicts where trails cross the tracks. Maximum speed will be 5-10mph with the potential for a lot of stopping and starting due to park users.

Southern Routes (Purple): 1 major conflict at the east end where route jumps north. 1 medium conflict where WB trains must merge with WB cars at the west end. 35 mph (road speed) or more if dedicated ROW




Image
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL: Port Authority Riverfront Project

Post by normalthings »

Parcel 12B is ready to start city applications in the next week or weeks.

Casino KC renovation broke ground officially last week. Main restaurant will be Andy Reid's favorite. (A Philadelphia business)

KC RF Extension to casino and RF east continues.
langosta
Valencia Place
Valencia Place
Posts: 1612
Joined: Mon May 27, 2019 4:02 am

Re: OFFICIAL: Port Authority Riverfront Project

Post by langosta »

I am interested to see what Casino KC phase 2 will look like. I know a streetcar stop, hotel, and amphitheater were mentioned last year. It would be great if they put in an actual hotel and not just a house branded one.

Any indication of when it might get going?