Has anyone noticed any similar action with the muehlebach?

Re: Muehlebach Hotel / KC Club Project

Posted: Tue Mar 26, 2019 1:19 pm
by KCPowercat
Nothing is happening there yet as far as I know. I heard some crazy unknowns with that building this weekend but don't want to pass along rumors that could very well be wrong.

Re: Muehlebach Hotel / KC Club Project

Posted: Tue Mar 26, 2019 2:59 pm
by TheLastGentleman
You could post in the "kansas city rumors" section

Re: Muehlebach Hotel / KC Club Project

Posted: Tue Mar 26, 2019 4:41 pm
by KCPowercat
It's not even that exciting

Re: Muehlebach Hotel / KC Club Project

Posted: Sun Apr 21, 2019 10:20 pm
by Critical_Mass
Critical_Mass wrote: Fri Dec 28, 2018 2:01 pm I've heard that Hoefer Wysocki only did a study for this project (which produced the renderings we've been looking at) and that another well known local architecture firm is part of the project team. So I expect the actual project to look somewhat different.
I'm not sure if the HW renderings were for a 70k sf or 100k sf project, but I was told by someone on the project team that the project 'has always been 100k sf' since at least they were brought on.
Biz Journal article about Platform Ventures mentions this office building is 150k sf and a 400 space garage. So that's slightly more than double the original 70k sf.

https://www.bizjournals.com/kansascity/ ... s_headline

I do know that Hoefer Wysocki is back on as the architect. They appear to be looking for new digs and what architect doesn't want to design their own home?

Re: Muehlebach Hotel / KC Club Project

Posted: Sun Apr 21, 2019 10:41 pm
by normalthings
Any idea roughly how many stories the building is now?

Re: Muehlebach Hotel / KC Club Project

Posted: Sun Apr 21, 2019 10:57 pm
by Critical_Mass
I was told 7 but I think that might have been referring to when it was 100k sf.

Re: Muehlebach Hotel / KC Club Project

Posted: Sat Jun 08, 2019 8:10 pm
by TheLastGentleman
Image

Re: Muehlebach Hotel / KC Club Project

Posted: Sat Jun 08, 2019 9:49 pm
by FangKC
Isn't this the second time the Clubhouse Lofts have been renovated in 16 years?

Re: Muehlebach Hotel / KC Club Project

Posted: Sun Jun 09, 2019 10:03 am
by KCPowercat
Yup.

So the second phase with the mulebach is going to create some real operational challenges with the Marriott complex in many ways. The biggest is they are losing their biggest kitchen which is within the bowels of the building that they are losing access.

Re: Muehlebach Hotel / KC Club Project

Posted: Sat Jun 15, 2019 12:27 am
by Chris Stritzel
Has anyone heard anything new on the office building?

Re: Muehlebach Hotel / KC Club Project

Posted: Sun Jun 16, 2019 12:15 am
by FangKC
The last we heard it was going through a redesign because it's getting more square footage.

Re: Muehlebach Hotel / KC Club Project

Posted: Sun Jun 16, 2019 9:01 am
by Critical_Mass
Last I heard was Hoefer Wysocki was going to relocate here (and design the building)

Re: Muehlebach Hotel / KC Club Project

Posted: Fri Jun 28, 2019 3:26 pm
by DaveKCMO
Today:

Image

Re: Muehlebach Hotel / KC Club Project

Posted: Fri Aug 30, 2019 5:33 pm
by KCtoBrooklyn
A new plan for the office portion has been submitted on Compass. It does look like it has grown. It is now 140k sq feet of office space. Looks like 7 (maybe 8 ) floors of offices instead of the original proposal of 4.

Image

Image

Re: Muehlebach Hotel / KC Club Project

Posted: Fri Aug 30, 2019 5:49 pm
by taxi
Flashcube Redux?

Re: Muehlebach Hotel / KC Club Project

Posted: Fri Aug 30, 2019 6:04 pm
by KCtoBrooklyn
Here is the original rendering. Looks like it could retain a similar look, minus the angles

Image

Re: Muehlebach Hotel / KC Club Project

Posted: Fri Aug 30, 2019 6:08 pm
by FangKC
I wonder if they have a tenant in mind?

Re: Muehlebach Hotel / KC Club Project

Posted: Fri Aug 30, 2019 9:13 pm
by normalthings
Begin Construction Nov. 2019
Duration 23 Months
Planned Completion Oct. 2021

It is interesting to note that these drawings are referred to as the "short site"

Re: Muehlebach Hotel / KC Club Project

Posted: Sat Aug 31, 2019 12:29 am
by KCDowntown
The plans refer to this project as a 12-story building.