Sacramento Airport Expansion
Posted: Fri Feb 17, 2023 2:40 pm
Looks like some expansion work is underway for SMF. A pedestrian walkway is extending from the Central Terminal B to the airside concourse; they have been having trouble keeping up with passenger numbers with just the APM. Also in the plans is the Terminal B garage that was initially proposed as part of the Terminal B project back in 2007.
Only render I could find is for the pedestrian connection. the rest are from what looks to be a public presentation. Terminal A & B both look to be expanding by a fair bit, and the graphs I found show they’re projecting steady growth in traffic. Hopefully with the increase in capacity, KC can get a non-stop route to SMF in the medium term. Link to the website is also listed below.
https://sacramento.aero/smforward
Only render I could find is for the pedestrian connection. the rest are from what looks to be a public presentation. Terminal A & B both look to be expanding by a fair bit, and the graphs I found show they’re projecting steady growth in traffic. Hopefully with the increase in capacity, KC can get a non-stop route to SMF in the medium term. Link to the website is also listed below.
https://sacramento.aero/smforward