Page 14 of 15

Re: Tracks 215 Project

Posted: Fri Dec 01, 2023 10:45 am
by KC_Ari
Really hoping it pulls through to the finish line and the groundwater issues didn't tank the budget.

Re: Tracks 215 Project

Posted: Fri Dec 01, 2023 11:44 am
by bspecht
New development schedule submitted for the TIF plan yesterday. Construction now set to finish in July 2025.
https://clerk.kcmo.gov/LegislationDetai ... FullText=1

Re: Tracks 215 Project

Posted: Fri Dec 01, 2023 1:42 pm
by UMKCroo
We have been in contact with the superintendent. Original finish was spring 2025, now pushed to July. They claim they are basically on schedule, which just astonishes me. I know we are in a different world, but I don't think we can state this enough: the Empire State Building was completed in 410 days!

Some interesting info trying to address some of these issues:

https://freakonomics.com/podcast/why-is ... n-america/

Re: Tracks 215 Project

Posted: Fri Dec 01, 2023 1:51 pm
by bspecht
Previous TIF amendment (Jan 2021) expected a April 2021-March 2023 (23 months) construction timeline. Broke ground Dec 2021. New schedule states Dec 2021-July 2025 (42 months) construction phase.

Re: Tracks 215 Project

Posted: Fri Dec 01, 2023 2:08 pm
by UMKCroo
bspecht wrote: Fri Dec 01, 2023 1:51 pm Previous TIF amendment (Jan 2021) expected a April 2021-March 2023 (23 months) construction timeline. Broke ground Dec 2021. New schedule states Dec 2021-July 2025 (42 months) construction phase.
Sorry, on schedule post water retention issues.

Re: Tracks 215 Project

Posted: Fri Dec 22, 2023 12:55 pm
by Highlander
UMKCroo wrote: Fri Dec 01, 2023 2:08 pm
bspecht wrote: Fri Dec 01, 2023 1:51 pm Previous TIF amendment (Jan 2021) expected a April 2021-March 2023 (23 months) construction timeline. Broke ground Dec 2021. New schedule states Dec 2021-July 2025 (42 months) construction phase.
Sorry, on schedule post water retention issues.
I was at Jack's Stack a couple of nights ago. It was dark and from an angle I wasn't use to seeing it, it seemed they had actually made some progress on the building since earlier in the Fall.

Re: Tracks 215 Project

Posted: Fri Dec 29, 2023 4:52 pm
by bspecht
Last week.
Image

Re: Tracks 215 Project

Posted: Sat Dec 30, 2023 12:25 pm
by TheLastGentleman
Image

Image

Re: Tracks 215 Project

Posted: Sat Dec 30, 2023 2:40 pm
by grecobs
This thing is gonna be big. Love to see it!

Re: Tracks 215 Project

Posted: Sat Dec 30, 2023 6:48 pm
by KC_Ari
Nice to see lots of activity working to get this one done

Re: Tracks 215 Project

Posted: Sun Mar 03, 2024 10:00 pm
by Chris Stritzel
We'll see wood framing showing up before long.
Image
Image
Image

Re: Tracks 215 Project

Posted: Mon Mar 04, 2024 4:43 pm
by TrolliKC
Wow thanks for the photos. I used to live in Arterra and haven't seen it for awhile. I miss it a little even though it was kind of crappy

Re: Tracks 215 Project

Posted: Mon Mar 11, 2024 8:53 pm
by Chris Stritzel
Image
Image
Image
Image

Re: Tracks 215 Project

Posted: Mon Mar 11, 2024 11:50 pm
by FangKC
Thanks for all the photos today Chris. How about swinging over to Beacon Hill and updating us on new houses on Forest Avenue?

https://www.google.com/maps/@39.0795359 ... ?entry=ttu

And new houses in the Plaza Heights neighborhood north of 45th Street to Corbin Terrace?

https://www.google.com/maps/@39.0452202 ... ?entry=ttu

Re: Tracks 215 Project

Posted: Sat Mar 16, 2024 8:13 pm
by DaveKCMO
Traffic control extended through 2025...

Re: Tracks 215 Project

Posted: Sat Mar 16, 2024 10:55 pm
by TheLastGentleman
It's only been just over two years, but for some reason it feels like this has been under construction for a long time

Re: Tracks 215 Project

Posted: Mon Mar 18, 2024 9:31 am
by dnweava
The site in 1911

Image

Re: Tracks 215 Project

Posted: Tue May 28, 2024 12:03 am
by GRID
So was just in KC and this project is really dragging out. I saw they removed the tower crane and only have some of the first wooden floor up. Is this still stalled?

Re: Tracks 215 Project

Posted: Tue May 28, 2024 6:30 am
by Anthony_Hugo98
GRID wrote: Tue May 28, 2024 12:03 am So was just in KC and this project is really dragging out. I saw they removed the tower crane and only have some of the first wooden floor up. Is this still stalled?
Everything I’ve heard says it’s doing fine, just overall slow. They’re starting to move a bit quicker on the structure now, and they’ve added quite a bit now that they’re not doing concrete

Re: Tracks 215 Project

Posted: Tue May 28, 2024 7:52 am
by GRID
Anthony_Hugo98 wrote: Tue May 28, 2024 6:30 am
GRID wrote: Tue May 28, 2024 12:03 am So was just in KC and this project is really dragging out. I saw they removed the tower crane and only have some of the first wooden floor up. Is this still stalled?
Everything I’ve heard says it’s doing fine, just overall slow. They’re starting to move a bit quicker on the structure now, and they’ve added quite a bit now that they’re not doing concrete
That's good news. Odd it's taking so long to build it.