Phase 2 streetcar to North Kansas City
- KCPowercat
- Ambassador
- Posts: 34063
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Phase 2 streetcar to North Kansas City
Only issue is to board nb from river market have to get to 5th and walnut. Not s huge loss.
- GRID
- City Hall
- Posts: 17222
- Joined: Mon Sep 15, 2003 12:20 pm
- Contact:
Re: Phase 2 streetcar to North Kansas City
I see, but actually, that's probably going to be needed. Especially during events like soccer games and riverfront festivals. A larger platform on Grand there would make the logistics of moving a lot of people to and from the Riverfront much easier. That other river market stop is already really busy.KCPowercat wrote: ↑Wed Jun 29, 2022 9:41 pm Only issue is to board nb from river market have to get to 5th and walnut. Not s huge loss.
Probably something they can always fix later though.
- KCPowercat
- Ambassador
- Posts: 34063
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Phase 2 streetcar to North Kansas City
Meh that stop at 5th is big. Coming back south out of the park there will be two viable stops to unload everyone.
-
- Alameda Tower
- Posts: 1068
- Joined: Sat Jan 04, 2020 12:02 pm
Re: Phase 2 streetcar to North Kansas City
As I mentioned dual options would be good. SC system for Swift. Some kind of dedicated light rail/commuter based line down Burlington. Find a good spot for a large park & ride facility & build dedicated commuter line. The SC itself is not really mass transit. But regardless will be excited for whatever they doGRID wrote: ↑Wed Jun 29, 2022 2:36 pm Going down Swift keeps it a local "tram" and it's not likely to ever be extended any further north.
Going down Burlington and create an opportunity to transition into a higher level of actual mass transit meaning people will actually use it for commuting and to get to places like KCI (as long as it maintains a dedicated RoW to the north). Burlington also seems like it's more of a wide open canvas to build up the corridor with high density residential.
Either way works, but whichever is chosen will direct the future of "rail" in KC.
- FangKC
- City Hall
- Posts: 18301
- Joined: Sat Jul 26, 2003 10:02 pm
- Location: Old Northeast -- Indian Mound
Re: Phase 2 streetcar to North Kansas City
North Kansas City residents share preferred streetcar routes from among eight options
https://www.bizjournals.com/kansascity/ ... 2022-07-01...
Residents used sticky notes to share feedback on pairs of recommended route options for each of three potential northern legs, which could see the streetcar stretch across the Heart of America Bridge and reach as far as 32nd Avenue. The options presented amount to eight possible combinations, with estimated costs ranging from $177.4 million to $204.2 million, if all three legs were fully built out.
From south to north, the North Kansas City route options recommended were:
River Market Option #1 ($28.6 million) — A "couplet" route design that extends the current streetcar east along both Third and Fifth streets to Missouri Route 9, with two potential stops, including one near Columbus Park.
River Market Option #2 ($25.7 million) — A two-way extension east along Third Street to Missouri Route 9, with one potential stop.
River Crossing Option #1 ($32.9 million) — A single dedicated streetcar lane across the east side of the Heart of America Bridge, next to a multiuse trail, to 10th Avenue in North Kansas City.
River Crossing Option #2 ($22 million) — A single dedicated streetcar lane across the west side of the Heart of America Bridge, across from an east-side multiuse trail, to 10th Avenue in North Kansas City.
North Kansas City Option #1 ($129.7 million) — Two dedicated streetcar lanes that run along the middle of Burlington Avenue between 10th and 29th avenues, with five potential stops.
North Kansas City Option #2 ($142.7 million) — Two streetcar lanes shared with motor traffic that stretch two blocks east from 10th Avenue to run along the middle of Swift Avenue to 32nd Avenue, with seven potential stops.
...
North Kansas City officials could start to review the feedback later this summer and determine a final route preference in the fall. The NorthRail study is estimated to be complete by the end of 2022.
...
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Phase 2 streetcar to North Kansas City
Reading old KC transit studies.
1998 study projected 3,000 daily riders for a line from I-29 & North Oak to RM in forecast year 2020.
1998 study projected 3,000 daily riders for a line from I-29 & North Oak to RM in forecast year 2020.
- beautyfromashes
- One Park Place
- Posts: 7290
- Joined: Mon Mar 21, 2005 11:04 am
Re: Streetcar to the riverfront
How would this work with the Northland extension? I assume there would be some cars going to the riverfront and some going to the north? Any complications that could bring with trains doing separate loops instead of our current lined-up functionality?GRID wrote: ↑Thu Dec 08, 2022 10:46 pm Pretty detailed renderings and plans here:
https://kcstreetcar.org/wp-content/uplo ... educed.pdf
https://kcstreetcar.org/wp-content/uplo ... -Final.pdf
- GRID
- City Hall
- Posts: 17222
- Joined: Mon Sep 15, 2003 12:20 pm
- Contact:
Re: Streetcar to the riverfront
Probably just run every other train to north?beautyfromashes wrote: ↑Fri Dec 09, 2022 12:07 amHow would this work with the Northland extension? I assume there would be some cars going to the riverfront and some going to the north? Any complications that could bring with trains doing separate loops instead of our current lined-up functionality?GRID wrote: ↑Thu Dec 08, 2022 10:46 pm Pretty detailed renderings and plans here:
https://kcstreetcar.org/wp-content/uplo ... educed.pdf
https://kcstreetcar.org/wp-content/uplo ... -Final.pdf
- beautyfromashes
- One Park Place
- Posts: 7290
- Joined: Mon Mar 21, 2005 11:04 am
Re: Streetcar to the riverfront
Yes, but riverfront line would be much shorter than northland. I guess that would cycle more trains through downtown area than northland giving shorter lead time in those areas. That doesn’t sound bad. Either way, will require riders to ge a little more heads-up on what train they jump on to. Right now, the line is so small and simple there’s really no thought required. Will have to watch for trains stacking up and causing big gaps.
- KCPowercat
- Ambassador
- Posts: 34063
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Streetcar to the riverfront
Yeah I'd guess like every 3-4th one goes north depending on time of day of course. I'm sure it's an easy thing to figure out, lines 100000x our size figure it out.
-
- Alameda Tower
- Posts: 1309
- Joined: Mon Oct 14, 2002 7:16 pm
- Location: Charlotte, NC
Re: Streetcar to the riverfront
Since the NKC line is being discussed here, if the HOA approach isn't lowered to the level of 3rd and 5th, how will it connect to the Main Street line?
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
- KCPowercat
- Ambassador
- Posts: 34063
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Phase 2 streetcar to North Kansas City
Let's act like there isn't a path forward w/o lowering. 2 birds 1 stone.
If sharing one rail across the bridge that's probably the question as can't go both ways.
If sharing one rail across the bridge that's probably the question as can't go both ways.
- Cratedigger
- Valencia Place
- Posts: 1874
- Joined: Thu Dec 02, 2021 3:32 pm
Re: Phase 2 streetcar to North Kansas City
From what I've gathered, the preferred option by both the residents and MoDot is same track on the East side of the bridge. Move the median over slightly west and use the tracks as a buffer to the bike lane.
Not sure about how it would connect to the rest of the line but I'm sure they've thought through it
Not sure about how it would connect to the rest of the line but I'm sure they've thought through it
- Anthony_Hugo98
- Valencia Place
- Posts: 1994
- Joined: Fri Mar 22, 2019 10:50 pm
- Location: Overland Park, KS
Re: Phase 2 streetcar to North Kansas City
Per Tom, they should be having some info come out of the preferred alternative and some data details for the project before years end. He did mention off wire capabilities to go across the bridge to help save money, didn’t get clarification if current vehicle fleet would be capable as is or need a retrofit. The swift routing is the preferred though so we know that at least, as well as a single track config on 3rd(WB) and 5th(EB)
- KCPowercat
- Ambassador
- Posts: 34063
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Phase 2 streetcar to North Kansas City
I'm going to throw a fit if we don't bring 9 highway down as part of this.
- GRID
- City Hall
- Posts: 17222
- Joined: Mon Sep 15, 2003 12:20 pm
- Contact:
Re: Phase 2 streetcar to North Kansas City
I would think it would cost a lot more to retrofit the vehicles to accommodate a battery than to build a catenary system across the bridge. Plus I personally don't like the hybrid trams. They just look bulky or something. KC's vehicles are nice and sleek and I hope they stay that way.Anthony_Hugo98 wrote: ↑Fri Dec 09, 2022 7:25 pm Per Tom, they should be having some info come out of the preferred alternative and some data details for the project before years end. He did mention off wire capabilities to go across the bridge to help save money, didn’t get clarification if current vehicle fleet would be capable as is or need a retrofit. The swift routing is the preferred though so we know that at least, as well as a single track config on 3rd(WB) and 5th(EB)
And I agree, if they are not going to build a dedicated bridge for the streetcar and pedestrians, then you have to bring Route 9 to at grade. The streetcar and the redesign of Rout 9 should be a single project or at least very tied together in how both are built.
-
- Oak Tower
- Posts: 5554
- Joined: Fri Sep 03, 2004 2:50 pm
- Location: Mount Hope
Re: Phase 2 streetcar to North Kansas City
If dedicated bridge would it be to east of HOA or west of ASB? Could the ASB be used where the center lanes of the old road deck were?
-
- Alameda Tower
- Posts: 1352
- Joined: Sun Sep 18, 2022 8:39 pm
Re: Phase 2 streetcar to North Kansas City
Lowering 9 highway as a part of this would bring my excitement level for this project from 4/10 to about 11/10. Please do it.
- beautyfromashes
- One Park Place
- Posts: 7290
- Joined: Mon Mar 21, 2005 11:04 am
Re: Phase 2 streetcar to North Kansas City
Why can’t they continue the current tracks from RM through Columbus Park across Lydia to the riverfront and then continue to NKC on one line instead of breaking into two?