Sorry you get that impression...not my intent to be negative. Just frustrating to see in many peoples opinions errors in design. We all are out for the same thing...to get the best product built. I don't think my comment required an attack on my "class" but that's just me.
Dumping this pubically available parking garage onto grand when grand gets closed so much and we have bike lanes on Grand seems like a miss. Truman and walnut were available.
Three light sounds like a much better design for parking entry. Cheers to whomever made that decision.
Dumping this pubically available parking garage onto grand when grand gets closed so much and we have bike lanes on Grand seems like a miss. Truman and walnut were available.
Three light sounds like a much better design for parking entry. Cheers to whomever made that decision.
- KCPowercat
- Ambassador
- Posts: 34027
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Three Light
Grand closures are sprint's given rights to do...but definitely will turn into two light's problem if something can't be worked out.
I appreciate wanting to leave Truman facade without a parking hole especially if the cap is coming. Evenso it is a big capacity street so dumping cars into it makes sense.
I don't see walnut as bring that big of a traffic problem but I don't drive it so I'll defer to you on that...what did the traffic study show?
I appreciate wanting to leave Truman facade without a parking hole especially if the cap is coming. Evenso it is a big capacity street so dumping cars into it makes sense.
I don't see walnut as bring that big of a traffic problem but I don't drive it so I'll defer to you on that...what did the traffic study show?
Re: Three Light
So when is three light going to start construction? This year still?
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Three Light
I guess we will find out whenever they decide to finally announce the project. Two Light is only 35% leased. That seems pretty low considering it’s just a few months out from opening. I think One Light was at least 80% leased on opening? Maybe they will continue push off the announcement till the leases increase.
This project(3 Light) will also have co-working space per City Scene KC. I wish they would jut put up an office tower already, but I get that it takes time.
This project(3 Light) will also have co-working space per City Scene KC. I wish they would jut put up an office tower already, but I get that it takes time.
Re: Three Light
Going back to committee on this.
Kind of funny comment where he was like you can send it back to committee but it's going to come out the same because of the 2004 agreement.
Kind of funny comment where he was like you can send it back to committee but it's going to come out the same because of the 2004 agreement.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Three Light
Parking Garage going back to Commitee.
Re: Three Light
It wasn't discussed. Speculating here, but I think they wanted this meeting to be about the airport but also knew a lot of people wanted to talk about cordish, so they tabled it a week.StrangerThings wrote:Who was there on the behalf of Cordish today?
There wasn't any objection, just a "okay well this is all mandated in the developer agreement so whatever. You guys can all give your speeches next week though." Also said there is no time pressure, so next week is fine.
I forget the council members involved. :/
- KCPowercat
- Ambassador
- Posts: 34027
- Joined: Mon Oct 07, 2002 12:49 pm
- Location: Quality Hill
- Contact:
Re: Three Light
Shields wanted to read more about the plan....nobody cared because the financial deal isn't done yet so moving it back a week won't matter...that's based on what the city manager mentioned.
Re: Three Light
And he brought up that the city doesn't have to build garages just when cordish asks, that there has to be an actual plan in place...for the next 99 years.
So I'm guessing everyone wants to bitch about the developer agreement before they pass this.
So I'm guessing everyone wants to bitch about the developer agreement before they pass this.
Re: Three Light
Is this the new rendering of Three Light in the Cityscene article? https://cityscenekc.com/signs-point-to- ... nt-market/
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Three Light
Its a couple years old
Re: Three Light
I was excited to think that 3 Light would begin construction as soon as 2 Light was completed (as when first announced).
I should have known that would be too ambitious for KC
As it all depends on how fast 2 fills up, now I think it could be up to a year or more before they break ground.
I understand these are high profile lots on the streetcar, but I wish they would scrap 3 and 4's design ideas and go shorter.
7-8 floors would keep the skyline density intact, allow them to start both tomorrow and then negotiate with the owners of the 12th & Grand lot to build something super tall and mixed use. (win, win, win)
I should have known that would be too ambitious for KC
As it all depends on how fast 2 fills up, now I think it could be up to a year or more before they break ground.
I understand these are high profile lots on the streetcar, but I wish they would scrap 3 and 4's design ideas and go shorter.
7-8 floors would keep the skyline density intact, allow them to start both tomorrow and then negotiate with the owners of the 12th & Grand lot to build something super tall and mixed use. (win, win, win)
aknowledgeableperson is currently on your ignore list.
You will no longer see any of her posts.
You will no longer see any of her posts.
-
- New York Life
- Posts: 458
- Joined: Thu Mar 17, 2016 8:41 am
Re: Three Light
What do you mean by "keep the skyline density intact"?NorthOak wrote:7-8 floors would keep the skyline density intact, allow them to start both tomorrow and then negotiate with the owners of the 12th & Grand lot to build something super tall and mixed use. (win, win, win)
-
- Mark Twain Tower
- Posts: 9862
- Joined: Tue Jul 17, 2012 7:54 am
Re: Three Light
The idea is to put less money into more blocks and rather than build onelarge towers, to have 4 blocks filled with shorter oneshorizons82 wrote:What do you mean by "keep the skyline density intact"?NorthOak wrote:7-8 floors would keep the skyline density intact, allow them to start both tomorrow and then negotiate with the owners of the 12th & Grand lot to build something super tall and mixed use. (win, win, win)
Re: Three Light
More like keep the skyline view from Liberty Memorial intact. Pretty sure that's what NorthOak really means.horizons82 wrote:What do you mean by "keep the skyline density intact"?NorthOak wrote:7-8 floors would keep the skyline density intact, allow them to start both tomorrow and then negotiate with the owners of the 12th & Grand lot to build something super tall and mixed use. (win, win, win)
Re: Three Light
I agree. The Skyline looks great and will only look better with the addition of the Light buildings and Convention Hotel. My biggest beef with the Light buildings is the name/signage they use (Just seems like not much thought was put into the naming). I know the names were likely part of the branding but why not use unique names for each building that helps branding (like "The District", "P&L Block", etc....) The buildings, themselves, are good additions. As Stranger Things commented, once the loop is capped having highrises there will make more sense.
- beautyfromashes
- One Park Place
- Posts: 7289
- Joined: Mon Mar 21, 2005 11:04 am
Re: Three Light
I’m fine with the delay. Redesigning a building so it doesn’t look the same as the others can take a lot of time. Take all the time you want to get it right!
Re: Three Light
Jfcbeautyfromashes wrote:I’m fine with the delay. Redesigning a building so it doesn’t look the same as the others can take a lot of time. Take all the time you want to get it right!
- KC_JAYHAWK
- Alameda Tower
- Posts: 1014
- Joined: Tue Oct 08, 2002 10:33 am
- Location: Waldo
Re: Three Light
Really, it's called "One Cardinal Way"? That city is so ass backwards, everything is about their stupid Cardinals. Never been in a city so obsessed with their identity and baseball team.StrangerThings wrote:Many people don't like the naming of "blank" Light, but I can assure you an over abundance of thought went into that. A tie into the Power and Light name was crucial and trust me, out of all the choices this was a good one! I am jealous of the tower going up in STL, "One Cardinal Way" is a very cool building name, especially compared to One Light.
- normalthings
- Mark Twain Tower
- Posts: 8018
- Joined: Mon Mar 30, 2015 9:52 pm
Re: Three Light
If only that was what is happening. To me it would have made more sense to build 4 Light first due to it being a large hotel. That way there would have been less of a need for waiting on 2 Light to lease out.beautyfromashes wrote:I’m fine with the delay. Redesigning a building so it doesn’t look the same as the others can take a lot of time. Take all the time you want to get it right!