chingon wrote:
No need to fix the turn lane back up if you eliminate the south plaza jog...
plaza library generates a lot of trips. why eliminate jog now when streetcar construction will disrupt that segment of main/brookside?
I see your point about construction, but isn’t that going to be an issue anywhere up and down Main Street, too. And you’d have trouble convincing me that the Plaza library stop wouldn’t generate just as many trips with a stop on Brookside and Ward PKWY.
The current stop is effectively right outside the door and I figured a quarter mile away for a streetcar stop and uphill either direction taken. So any physically limited current users (wheelchair, seniors with problems walking) might stop visiting this branch
I would expect transit users to the library to increase dramatically at the same time.
The question thus becomes, is there a workable alternative to the bus stop for users who are sensitive to the distance changes. Maybe another branch can be reached by changing the bus routes for the streetcar and move or add certain services to that branch. the Westport library is two blocks off Main but it's not uphill.
Yeah, could see CAPEX vs OPEX as the driving factors. So it would seem you are indicating any changes would be considered for next year's or following year's budget. Will ideas in this thread reach KCATA?
^So MAX will operate on Main during streetcar construction?
Suggestion...
- Reroute MAX in front of Union Station to Broadway (when the construction in that area completes)
- Announce on streetcar when pulling into US the 'free streetcar MAX bust extender to Westport/Plaza/Brookside/Waldo' in front of US.
- Improve bus stop signage in front of US, noting MAX to Westport/Plaza
Positioning as a 'streetcar bus extender' and endorsement from streetcar line should encourage much more usage. And more importantly, encourage bus timid people to give it a shot.
earthling wrote: ↑Fri Jul 02, 2021 11:23 am
^So MAX will operate on Main during streetcar construction?
Suggestion...
- Reroute MAX in front of Union Station to Broadway (when the construction in that area completes)
- Announce on streetcar when pulling into US the 'free streetcar MAX bust extender to Westport/Plaza/Brookside/Waldo' in front of US.
- Improve bus stop signage in front of US, noting MAX to Westport/Plaza
Positioning as a 'streetcar bus extender' and endorsement from streetcar line should encourage much more usage. And more importantly, encourage bus timid people to give it a shot.
$3.3 million for bike at $5000 per bike could buy 6600
At every 15 and 7 operational vehicles that’s no less than equal to the hourly capacity of the streetcar from river to UMKC.
A streetcar bike extender with access to free bike share bikes would do even more for transit because short distances doesn’t require waiting for the next bus.