What route should the third phase of streetcar expansion follow?

Linwood: Main to Michigan(71 Highway)
11
10%
Country Club ROW: UMKC to Brookside/Waldo
24
22%
Country Club ROW: UMKC through Brookside/Waldo to Prospect
14
13%
Linwood: Main to Emanuel Cleaver 2
13
12%
City/County Wide Rail Project
40
36%
Other
9
8%
 
Total votes: 111

shinatoo
Ambassador
Posts: 7392
Joined: Wed Jan 19, 2005 3:20 pm

Re: Phase Three Streetcar Expansion

Post by shinatoo »

I think I'll take Dave's word for it.

I didn't think the TDD was an option anymore with the vote to make all rail planning city wide. Am I off on that?
flyingember
Mark Twain Tower
Mark Twain Tower
Posts: 9862
Joined: Tue Jul 17, 2012 7:54 am

Re: Phase Three Streetcar Expansion

Post by flyingember »

shinatoo wrote:I think I'll take Dave's word for it.

I didn't think the TDD was an option anymore with the vote to make all rail planning city wide. Am I off on that?
NKC has a TDD on the books, never collected on.

It's known it's not enough value to fund the whole line though.
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1350
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Phase Three Streetcar Expansion

Post by alejandro46 »

shinatoo wrote:I think I'll take Dave's word for it.

I didn't think the TDD was an option anymore with the vote to make all rail planning city wide. Am I off on that?
So, going by the below article, I guess a TDD could still be used for funding, but a citywide vote would still be required for the city's participation.

http://www.kansascity.com/news/politics ... 84184.html


Man, Sherry DeJanes really just hates Kansas City. We need to reform that petition process. 1% of the absolute minimum voter participation gets to decide the streetcar expansion approval process.
User avatar
grovester
Oak Tower
Oak Tower
Posts: 4560
Joined: Thu Mar 13, 2008 7:30 pm
Location: KC Metro

Re: Phase Three Streetcar Expansion

Post by grovester »

The TDD method won't generate enough money in any other corridor in the city, so we didn't lose much by having to have a vote.
User avatar
DaveKCMO
Ambassador
Posts: 20039
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase Three Streetcar Expansion

Post by DaveKCMO »

flyingember wrote:
shinatoo wrote:I think I'll take Dave's word for it.

I didn't think the TDD was an option anymore with the vote to make all rail planning city wide. Am I off on that?
NKC has a TDD on the books, never collected on.

It's known it's not enough value to fund the whole line though.
The point is that NKC leadership is NOT talking seriously about streetcar right now. They had to be coaxed out of dismantling the TDD.

And you are actually correct that the 1/2-cent TDD sales tax wouldn't cover the cost of building or operating their segment of streetcar.
User avatar
alejandro46
Alameda Tower
Alameda Tower
Posts: 1350
Joined: Fri Feb 02, 2018 11:24 pm
Location: King in the North(Land)

Re: Phase Three Streetcar Expansion

Post by alejandro46 »

DaveKCMO wrote:
flyingember wrote:
shinatoo wrote:I think I'll take Dave's word for it.

I didn't think the TDD was an option anymore with the vote to make all rail planning city wide. Am I off on that?
NKC has a TDD on the books, never collected on.

It's known it's not enough value to fund the whole line though.
The point is that NKC leadership is NOT talking seriously about streetcar right now. They had to be coaxed out of dismantling the TDD.

And you are actually correct that the 1/2-cent TDD sales tax wouldn't cover the cost of building or operating their segment of streetcar.
Right, that is the conclusion of the NorthRail study, if I recall. Absolutely feasible to build a NKC spur, but funding model is the issue especially factoring in cost to cross the bridge. and lack of population + lots of industrial buildings who would likely very much not be in favor of the previously used TDD assessments/sales tax district.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Phase Three Streetcar Expansion

Post by normalthings »

Would it be possible to create TDD for BRT?
User avatar
DaveKCMO
Ambassador
Posts: 20039
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase Three Streetcar Expansion

Post by DaveKCMO »

ldai_phs wrote:Would it be possible to create TDD for BRT?
To build, but not operate. Another strange fluke of the TDD Act.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: Phase Three Streetcar Expansion

Post by normalthings »

Have read a number of comments of twitter/Facebook saying “we need to build LR for the World Cup”. Hopefully World Cup fever and a wider desire for public transit will help regional rail efforts.
WoodDraw
Hotel President
Hotel President
Posts: 3348
Joined: Tue Jan 27, 2004 8:53 pm

Re: Phase Three Streetcar Expansion

Post by WoodDraw »

That's silly. We need temporary brt if we win. Rail to the stadium isn't sustainable at this time.

The best thing KC could do right now is rebrand a bus as an airport shuttle. Bright colors, AC, WIFI, few stops. TV on board announcing stops and terminals.
flyingember
Mark Twain Tower
Mark Twain Tower
Posts: 9862
Joined: Tue Jul 17, 2012 7:54 am

Re: Phase Three Streetcar Expansion

Post by flyingember »

WoodDraw wrote:That's silly. We need temporary brt if we win. Rail to the stadium isn't sustainable at this time.
Upgrade 101 or 106 permanently (one is planned, didn't check which) to BRT service

And then for the game you don't implement temp BRT, you implement express coach bus from select locations to move parking outwards. If you do it right you run the service for a month before to work out kinks and actually operate it for commuters during this time.

Have terminuses such as Oak Park Mall, downtown, the airport and such.

What you gain is knowledge of it people will use such a service if it's available and use the world cup to fund the research
shinatoo
Ambassador
Posts: 7392
Joined: Wed Jan 19, 2005 3:20 pm

Re: Phase Three Streetcar Expansion

Post by shinatoo »

BRT to the airport. Call it the "KCI Flyer".
User avatar
DaveKCMO
Ambassador
Posts: 20039
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase Three Streetcar Expansion

Post by DaveKCMO »

From the Biz Journal article:
In the long term, James said he hoped to see an east-west extension in the streetcar’s future, as was proposed in 2014. Voters rejected the larger effort to extend the streetcar to the Country Club Plaza, as well as east on Independence Avenue and Linwood Boulevard.

“It's a starter line. It was never envisioned to be a finished line,” James said. “And we have to go east. It's a matter of economic equity, but also a matter of connecting this city in ways that we don't normally do.”

Gerend said two likely cross streets with east-west potential would be Independence Avenue and 39th Street, which are served by Main Street MAX buses.

"When we talk about future extensions, we need to be equitable in how we extend it," James said. "It won't be easy. But it's absolutely essential."
tower
Strip mall
Strip mall
Posts: 296
Joined: Tue Sep 05, 2017 8:45 am
Location: Midtown

Re: Phase Three Streetcar Expansion

Post by tower »

DaveKCMO wrote:From the Biz Journal article:
In the long term, James said he hoped to see an east-west extension in the streetcar’s future, as was proposed in 2014. Voters rejected the larger effort to extend the streetcar to the Country Club Plaza, as well as east on Independence Avenue and Linwood Boulevard.

“It's a starter line. It was never envisioned to be a finished line,” James said. “And we have to go east. It's a matter of economic equity, but also a matter of connecting this city in ways that we don't normally do.”

Gerend said two likely cross streets with east-west potential would be Independence Avenue and 39th Street, which are served by Main Street MAX buses.

"When we talk about future extensions, we need to be equitable in how we extend it," James said. "It won't be easy. But it's absolutely essential."
I've always thought that 39th makes the most sense for an east-west midtown street (and it can be more light rail-ish as it gets further east and go to the stadiums), but i have never seen it mentioned before and assumed there was a feasibility issue with the Gillham park hill or something.
User avatar
DaveKCMO
Ambassador
Posts: 20039
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase Three Streetcar Expansion

Post by DaveKCMO »

It's never been studied and that hill might be an issue, although it was there when the previous streetcar system was in place.
tower
Strip mall
Strip mall
Posts: 296
Joined: Tue Sep 05, 2017 8:45 am
Location: Midtown

Re: Phase Three Streetcar Expansion

Post by tower »

DaveKCMO wrote:It's never been studied and that hill might be an issue, although it was there when the previous streetcar system was in place.
Using the cycling route elevation feature on google maps, it looks like Warwick to Gilliam is a 4.7% gradient, about the same as the Pershing to 30th gradient on Main. Locust to the tennis courts looks to be closer to an 11% grade though, which is not unprecedented, but is very high, especially in mixed traffic with a stop sign at the bottom of the hill. I think the Gillham to Kenwood is about 8% I think.

I have no idea how trustworthy the cycling route elevation feature on google maps is though, so I could be way off.

Edit: I was able to find a streetview of a 14.5% tram gradient in Libson, Portugal, but our vehicles look a bit heavier.

https://www.google.com/maps/@38.7089053 ... 312!8i6656
flyingember
Mark Twain Tower
Mark Twain Tower
Posts: 9862
Joined: Tue Jul 17, 2012 7:54 am

Re: Phase Three Streetcar Expansion

Post by flyingember »

Was told in the past they would handle the hill up N Oak part NE 32nd

Compare to that for grade
User avatar
voltopt
Broadway Square
Broadway Square
Posts: 2812
Joined: Fri Dec 17, 2004 2:56 pm
Location: Manheim Park
Contact:

Re: Phase Three Streetcar Expansion

Post by voltopt »

DaveKCMO wrote:It's never been studied and that hill might be an issue, although it was there when the previous streetcar system was in place.

I'm looking for evidence, and it appears 39th Street has never featured a streetcar east of Main. I could be wrong. The 39th Street streetcar line seems to have extended only from Rainbow to Main. This makes sense, considering that 39th is mostly low density residential going east from Main, except where it intersects former n/s streetcar routes (Troost, Woodland, Brooklyn, Prospect, and Indiana) (also, the Brooklyn intersection is pretty much eradicated, but there is some commercial density remaining at the other n/s nodes)
User avatar
voltopt
Broadway Square
Broadway Square
Posts: 2812
Joined: Fri Dec 17, 2004 2:56 pm
Location: Manheim Park
Contact:

Re: Phase Three Streetcar Expansion

Post by voltopt »

That's not to say the grade is too steep for streetcar.
User avatar
Eon Blue
Alameda Tower
Alameda Tower
Posts: 1124
Joined: Mon Jan 30, 2012 11:28 pm
Location: Downtown KCMO

Re: Phase Three Streetcar Expansion

Post by Eon Blue »

According to this 1925 atlas, there were turning wyes at Prospect and Indiana on those lines. There was no through service east of main, though.

http://www.historicmapworks.com/Atlas/U ... City+1925/