Page 18 of 74

Re: New Broadway Bridge

Posted: Thu Dec 06, 2018 4:35 pm
by flyingember
grovester wrote: Thu Dec 06, 2018 3:44 pm Does that have any impact on obtaining funding for the streetcar extension?
No, that was submitted to New Starts for funding

http://kcstreetcar.org/about-streetcar/ ... extension/

Re: New Broadway Bridge

Posted: Thu Dec 06, 2018 5:17 pm
by DaveKCMO
grovester wrote: Thu Dec 06, 2018 3:44 pm Does that have any impact on obtaining funding for the streetcar extension?
I assume the riverfront streetcar was not selected this round.

Main street extension is seeking a different grant program (New Starts) and we're expecting the initial scoring very soon. We need a "medium" or above to advance.

Re: New Broadway Bridge

Posted: Thu Dec 06, 2018 9:42 pm
by GRID
Is there any renderings or final alignment plans for the new bridge or has nothing been decided?

Re: New Broadway Bridge

Posted: Thu Dec 06, 2018 9:55 pm
by KCPowercat
nothing design wise has been decided but everything points to a HOA type bridge.

Re: New Broadway Bridge

Posted: Fri Dec 07, 2018 9:41 pm
by moderne
At least there will be some nice new unobstructed driving views from it. The south end will still have to be very elevated like the current bridge and then the new ramps connecting to the freeway on the bluffs. I imagine there will be not pedestrian considerations?

Re: New Broadway Bridge

Posted: Sat Dec 08, 2018 8:41 am
by DaveKCMO
moderne wrote: Fri Dec 07, 2018 9:41 pm At least there will be some nice new unobstructed driving views from it. The south end will still have to be very elevated like the current bridge and then the new ramps connecting to the freeway on the bluffs. I imagine there will be not pedestrian considerations?
There MUST be pedestrian/bike access. It's part of the city's requirements and they're bringing local (GO Bond) money to the project.

Re: New Broadway Bridge

Posted: Wed Jan 23, 2019 1:02 pm
by KCPowercat
Any updates on this? Last project update on the site is 2017.

Re: New Broadway Bridge

Posted: Wed Jan 23, 2019 3:36 pm
by normalthings
KCPowercat wrote: Wed Jan 23, 2019 1:02 pm Any updates on this? Last project update on the site is 2017.
I had heard a “phase 2” is to kick off in 2019.

Re: New Broadway Bridge

Posted: Wed Jan 23, 2019 3:48 pm
by KCPowercat
Thanks

Re: New Broadway Bridge

Posted: Wed Jan 23, 2019 9:21 pm
by DaveKCMO

Re: New Broadway Bridge

Posted: Wed Jan 23, 2019 9:54 pm
by KCPowercat
I guess I did have that on my calendar. Do we have any idea what that being will involve?

Re: New Broadway Bridge

Posted: Wed Feb 13, 2019 2:28 am
by normalthings
Updated project schedule

Image

Please take and share the following survey. On the written comment section, mention a desire for both a new bridge and the removal of the North Loop. https://www.surveymonkey.com/r/BUCKONEIL

Re: New Broadway Bridge

Posted: Wed Feb 13, 2019 7:47 am
by KCPowercat
Sounds like we need to be writing to KCK about the north loop part.

Anybody know if bringing 9 highway down to grade can be separated from the north loop decision? That seemed like something everybody was into but not sure it can be done without some substantial work on the interchange over 70.

Re: New Broadway Bridge

Posted: Wed Feb 13, 2019 11:32 am
by flyingember
KCPowercat wrote: Wed Feb 13, 2019 7:47 am Sounds like we need to be writing to KCK about the north loop part.

Anybody know if bringing 9 highway down to grade can be separated from the north loop decision? That seemed like something everybody was into but not sure it can be done without some substantial work on the interchange over 70.
It looks like it depends on the the slope they'll build.

It's ~0.15 of a mile from the start of the earth portion north of I-70 to 5th. That might be enough to drop to street level.

Re: New Broadway Bridge

Posted: Wed Feb 13, 2019 12:07 pm
by KCPowercat
Anybody with actual knowledge of the project status?

Re: New Broadway Bridge

Posted: Wed Feb 13, 2019 10:45 pm
by DaveKCMO
KCPowercat wrote: Wed Feb 13, 2019 7:47 am Anybody know if bringing 9 highway down to grade can be separated from the north loop decision?
Sort of. They're related, obviously, but can be done as independent projects. The approach for MO-9 depends on the decision for the North Loop.

Re: New Broadway Bridge

Posted: Wed Feb 13, 2019 10:58 pm
by KCPowercat
Thanks.

Re: New Broadway Bridge

Posted: Wed Apr 10, 2019 4:31 pm
by DaveKCMO

Re: New Broadway Bridge

Posted: Wed Apr 10, 2019 4:55 pm
by KCPowercat
Modot is ridiculous. City should take their ineptitude to court

Re: New Broadway Bridge

Posted: Wed Apr 10, 2019 11:15 pm
by normalthings
KCPowercat wrote: Wed Apr 10, 2019 4:55 pm Most is ridiculous. City should take their ineptitude to court
What if we used the steam boat legacy fund to build a steam boat inspired bridge? As a bonus, Steam Boat Arabia could move in under the new bridge.