User avatar
normalthings
Valencia Place
Valencia Place
Posts: 1615
Joined: Mon Mar 30, 2015 9:52 pm

Re: Phase 2 streetcar to UMKC

Post by normalthings » Thu Apr 11, 2019 4:12 pm

smh wrote:
Thu Apr 11, 2019 4:10 pm
normalthings wrote:
Thu Apr 11, 2019 4:06 pm
smh wrote:
Thu Apr 11, 2019 4:05 pm


I haven't looked at the design docs but are you sure the Pershing crossover isn't the existing switch?
Yes. There is a new crossover in the Pershing intersection and then the existing crossover north of US Station.
I see that now. Perhaps it replaces the existing switch?
Haven’t they had issues with that switch in the past? Maybe it’s a replacement to a more reliabile switch design/type?

User avatar
smh
Hotel President
Hotel President
Posts: 3195
Joined: Tue Jun 08, 2010 10:40 pm
Location: Central Loop

Re: Phase 2 streetcar to UMKC

Post by smh » Thu Apr 11, 2019 4:24 pm

normalthings wrote:
Thu Apr 11, 2019 4:12 pm
smh wrote:
Thu Apr 11, 2019 4:10 pm
normalthings wrote:
Thu Apr 11, 2019 4:06 pm


Yes. There is a new crossover in the Pershing intersection and then the existing crossover north of US Station.
I see that now. Perhaps it replaces the existing switch?
Haven’t they had issues with that switch in the past? Maybe it’s a replacement to a more reliabile switch design/type?
Maybe so! I know these are early design documents, but it would be real nice to see all the channelized right turns along the route removed. Perhaps that's a later iteration of the design.

User avatar
KCPowercat
Power & Light
Power & Light
Posts: 29256
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: Phase 2 streetcar to UMKC

Post by KCPowercat » Thu Apr 11, 2019 4:25 pm

Yeah I was thinking maybe replacement? Maybe it will switch both ways now so you could run US to UMKC say in case of a downtown problem or event?

Seems Pershing to 27th (NB) and 45th and 47th should run in a dedicated (aka concrete barrier) lane.

Love the removal of HAWK signals.

User avatar
DaveKCMO
Global Moderator
Global Moderator
Posts: 17275
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase 2 streetcar to UMKC

Post by DaveKCMO » Thu Apr 11, 2019 4:58 pm

smh wrote:
Thu Apr 11, 2019 4:24 pm
normalthings wrote:
Thu Apr 11, 2019 4:12 pm
smh wrote:
Thu Apr 11, 2019 4:10 pm


I see that now. Perhaps it replaces the existing switch?
Haven’t they had issues with that switch in the past? Maybe it’s a replacement to a more reliabile switch design/type?
Maybe so! I know these are early design documents, but it would be real nice to see all the channelized right turns along the route removed. Perhaps that's a later iteration of the design.
When the next public comment comes up, PLEASE ASK FOR THIS. They can only take so much of me asking.

User avatar
smh
Hotel President
Hotel President
Posts: 3195
Joined: Tue Jun 08, 2010 10:40 pm
Location: Central Loop

Re: Phase 2 streetcar to UMKC

Post by smh » Fri Apr 12, 2019 11:11 am

DaveKCMO wrote:
Thu Apr 11, 2019 4:58 pm
smh wrote:
Thu Apr 11, 2019 4:24 pm
normalthings wrote:
Thu Apr 11, 2019 4:12 pm


Haven’t they had issues with that switch in the past? Maybe it’s a replacement to a more reliabile switch design/type?
Maybe so! I know these are early design documents, but it would be real nice to see all the channelized right turns along the route removed. Perhaps that's a later iteration of the design.
When the next public comment comes up, PLEASE ASK FOR THIS. They can only take so much of me asking.
Will do!

User avatar
beautyfromashes
Oak Tower
Oak Tower
Posts: 4617
Joined: Mon Mar 21, 2005 11:04 am

Re: Phase 2 streetcar to UMKC

Post by beautyfromashes » Mon Apr 15, 2019 4:42 pm

Shouldn’t there have been an election for a new TDD officer this last election? I don’t remember seeing it in the ballot.

User avatar
DaveKCMO
Global Moderator
Global Moderator
Posts: 17275
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase 2 streetcar to UMKC

Post by DaveKCMO » Mon Apr 15, 2019 5:44 pm

beautyfromashes wrote:
Mon Apr 15, 2019 4:42 pm
Shouldn’t there have been an election for a new TDD officer this last election? I don’t remember seeing it in the ballot.
We were surprised to discover that if the seat is uncontested, no election is required in this case. That's good for ratepayers because the election costs are borne by the district. It would have been on the April ballot, which is something we also learned later (rather than being its own special election like the first one). Such a bizarre law!

Obviously people like to have choices in elections, but since the new TDD has no resources yet and those revenue sources haven't been turned on, no one was interested in challenging the two directors with one-year terms.

User avatar
beautyfromashes
Oak Tower
Oak Tower
Posts: 4617
Joined: Mon Mar 21, 2005 11:04 am

Re: Phase 2 streetcar to UMKC

Post by beautyfromashes » Mon Apr 15, 2019 6:53 pm

DaveKCMO wrote:
Mon Apr 15, 2019 5:44 pm
beautyfromashes wrote:
Mon Apr 15, 2019 4:42 pm
Shouldn’t there have been an election for a new TDD officer this last election? I don’t remember seeing it in the ballot.
Obviously people like to have choices in elections, but since the new TDD has no resources yet and those revenue sources haven't been turned on, no one was interested in challenging the two directors with one-year terms.
Ok, so the two original directors ran again unopposed and “won”. Thanks for clearing up a curious question.

User avatar
DaveKCMO
Global Moderator
Global Moderator
Posts: 17275
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase 2 streetcar to UMKC

Post by DaveKCMO » Mon Apr 15, 2019 7:56 pm

beautyfromashes wrote:
Mon Apr 15, 2019 6:53 pm
DaveKCMO wrote:
Mon Apr 15, 2019 5:44 pm
beautyfromashes wrote:
Mon Apr 15, 2019 4:42 pm
Shouldn’t there have been an election for a new TDD officer this last election? I don’t remember seeing it in the ballot.
Obviously people like to have choices in elections, but since the new TDD has no resources yet and those revenue sources haven't been turned on, no one was interested in challenging the two directors with one-year terms.
Ok, so the two original directors ran again unopposed and “won”. Thanks for clearing up a curious question.
It doesn’t pay. The filing fee is $5. There were options in the original election and none of them tried again.

User avatar
smh
Hotel President
Hotel President
Posts: 3195
Joined: Tue Jun 08, 2010 10:40 pm
Location: Central Loop

Re: Phase 2 streetcar to UMKC

Post by smh » Tue Apr 16, 2019 9:47 am

DaveKCMO wrote:
Mon Apr 15, 2019 7:56 pm
beautyfromashes wrote:
Mon Apr 15, 2019 6:53 pm
DaveKCMO wrote:
Mon Apr 15, 2019 5:44 pm

Obviously people like to have choices in elections, but since the new TDD has no resources yet and those revenue sources haven't been turned on, no one was interested in challenging the two directors with one-year terms.
Ok, so the two original directors ran again unopposed and “won”. Thanks for clearing up a curious question.
It doesn’t pay. The filing fee is $5. There were options in the original election and none of them tried again.
When was the filing deadline? How would a person learn when the next seats are up if they wanted to run?

User avatar
DaveKCMO
Global Moderator
Global Moderator
Posts: 17275
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase 2 streetcar to UMKC

Post by DaveKCMO » Tue Apr 16, 2019 7:53 pm


User avatar
smh
Hotel President
Hotel President
Posts: 3195
Joined: Tue Jun 08, 2010 10:40 pm
Location: Central Loop

Re: Phase 2 streetcar to UMKC

Post by smh » Wed Apr 17, 2019 9:02 am

There hasn't been a post since September. Doesn't exactly feel like transparent governance. Haha

User avatar
DaveKCMO
Global Moderator
Global Moderator
Posts: 17275
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase 2 streetcar to UMKC

Post by DaveKCMO » Wed Apr 17, 2019 5:22 pm

smh wrote:
Wed Apr 17, 2019 9:02 am
There hasn't been a post since September. Doesn't exactly feel like transparent governance. Haha
Not much has actually been happening. Here's the post that's relevant: https://www.facebook.com/mainstreetrail ... =3&theater

User avatar
smh
Hotel President
Hotel President
Posts: 3195
Joined: Tue Jun 08, 2010 10:40 pm
Location: Central Loop

Re: Phase 2 streetcar to UMKC

Post by smh » Thu Apr 18, 2019 9:20 am

DaveKCMO wrote:
Wed Apr 17, 2019 5:22 pm
smh wrote:
Wed Apr 17, 2019 9:02 am
There hasn't been a post since September. Doesn't exactly feel like transparent governance. Haha
Not much has actually been happening. Here's the post that's relevant: https://www.facebook.com/mainstreetrail ... =3&theater
I assume the notice was posted only in the Daily Record or something like that. Would be nice if next December there was at least an announcement on facebook. But I get that there really isn't any work going on at this point.

User avatar
DaveKCMO
Global Moderator
Global Moderator
Posts: 17275
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase 2 streetcar to UMKC

Post by DaveKCMO » Sat Apr 20, 2019 12:07 pm

Draft Environmental Assessment document is available: http://kcstreetcar.org/about-streetcar/ ... extension/

Riverite
Strip mall
Strip mall
Posts: 196
Joined: Fri Apr 07, 2017 5:49 pm

Re: Phase 2 streetcar to UMKC

Post by Riverite » Sun Apr 21, 2019 10:48 am

What would need to happen in order to shut down main to cars and only allow cross traffic every few blocks. I know it’s unlikely, but what steps would need to be taken

Riverite
Strip mall
Strip mall
Posts: 196
Joined: Fri Apr 07, 2017 5:49 pm

Re: Phase 2 streetcar to UMKC

Post by Riverite » Sun Apr 21, 2019 10:48 am

With the rise of autonomous cars it might be easier to redirect traffic away

User avatar
DaveKCMO
Global Moderator
Global Moderator
Posts: 17275
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: Phase 2 streetcar to UMKC

Post by DaveKCMO » Sun Apr 21, 2019 5:57 pm

Riverite wrote:
Sun Apr 21, 2019 10:48 am
What would need to happen in order to shut down main to cars and only allow cross traffic every few blocks. I know it’s unlikely, but what steps would need to be taken
Truman to 12th is the most likely segment, but if Cordish wants to shut Walnut for their lid that doesn't really help.

User avatar
KCPowercat
Power & Light
Power & Light
Posts: 29256
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: Phase 2 streetcar to UMKC

Post by KCPowercat » Sun Apr 21, 2019 6:23 pm

No shutting down walnut.

User avatar
wahoowa
Strip mall
Strip mall
Posts: 268
Joined: Sat May 02, 2015 2:57 pm
Location: CBD

Re: Phase 2 streetcar to UMKC

Post by wahoowa » Mon Apr 22, 2019 10:07 am

why would cordish want to shut down walnut when they're already so good at shutting down grand? /s