OFFICIAL - ARTerra (21st and Wyandotte)

Issues concerning Downtown as described by the Downtown Council. River to 31st Street, I-35 to Bruce R. Watkins.
User avatar
KCPowercat
Ambassador
Posts: 33839
Joined: Mon Oct 07, 2002 12:49 pm
Location: Quality Hill
Contact:

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by KCPowercat »

Weird how much publicity this one got on the twitters
User avatar
DaveKCMO
Ambassador
Posts: 20042
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by DaveKCMO »

smh wrote: Fri Jan 04, 2019 10:40 am Likely no one here needs reminding, but do recall that this was previously a Superfund site and it is now a lovely apartment tower. This is a massive win for the neighborhood and city.
That was me and it was disclosed to me when I bought my home a few blocks away. I got to watch them dismantle it brick-by-brick.
User avatar
FangKC
City Hall
City Hall
Posts: 18142
Joined: Sat Jul 26, 2003 10:02 pm
Location: Old Northeast -- Indian Mound

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by FangKC »

Image
Image
User avatar
DaveKCMO
Ambassador
Posts: 20042
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by DaveKCMO »

They missed an opportunity to be open for First Friday.
grecobs
Strip mall
Strip mall
Posts: 174
Joined: Fri Apr 25, 2014 11:53 am

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by grecobs »

Was out Downtown last night and saw one or two lights on in the building. Curious what initial occupancy rates are....
User avatar
FangKC
City Hall
City Hall
Posts: 18142
Joined: Sat Jul 26, 2003 10:02 pm
Location: Old Northeast -- Indian Mound

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by FangKC »

Take a look inside Copaken's new Arterra apartments [PHOTOS]

https://tinyurl.com/y2wuwyd3
User avatar
DaveKCMO
Ambassador
Posts: 20042
Joined: Sun Nov 27, 2005 6:22 pm
Location: Crossroads
Contact:

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by DaveKCMO »

When I toured on First Friday, they said 15% occupancy but a bunch of move-ins were scheduled.
User avatar
KCDowntown
Alameda Tower
Alameda Tower
Posts: 1029
Joined: Tue Oct 08, 2002 2:17 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by KCDowntown »

The last couple of weeks there's been a lot of permits related to combining the retail suites in this building into a single space. Today there is a permit for the installation of a sprinkler system for 'Modern Society'. This appears to be a Springfield, MO based apparel store with another location at Town Center.

This article from Springfield's newspaper from last year mentions that they wanted to open a location between downtown and the Plaza.

KCDowntown
User avatar
Anthony_Hugo98
Valencia Place
Valencia Place
Posts: 1932
Joined: Fri Mar 22, 2019 10:50 pm
Location: Overland Park, KS

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by Anthony_Hugo98 »

Is 'Modern Society' still the presumed entity to occupy the commercial space here?
bspecht
New York Life
New York Life
Posts: 474
Joined: Tue Jun 16, 2015 4:31 pm
Location: DC
Contact:

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by bspecht »

If website availability is correct, 20 units are available. 106/126 = ~84% inside of a year. Strong performance.
https://www.arterrakc.com/floor-plans.aspx
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by normalthings »

bspecht wrote: Sat Dec 14, 2019 2:54 pm If website availability is correct, 20 units are available. 106/126 = ~84% inside of a year. Strong performance.
https://www.arterrakc.com/floor-plans.aspx
Need to lease another 13-14 units reach full occupancy. 1.5 years is the time developers generally target for lease up to take. It shouldn’t be hard for them to lease another 13 units by June/July 2020.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by normalthings »

February 2020 Leasing Update: 11 availible units, 91.26% full.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by normalthings »

July 2020: 15 of 126 open units. 88% full per the Arterra leasing portal. https://arterraapts.prospectportal.com/ ... y/arterra/

Apartments.Com has the building at 93% leased.
earthling
Mark Twain Tower
Mark Twain Tower
Posts: 8519
Joined: Sun Sep 11, 2011 2:27 pm
Location: milky way, orion arm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by earthling »

Anyone have downtown occupancy numbers? I could only find River/Crown/Plaza for last quarter from Cushman and RCP was near 95%. Quite good but not better than metro avg.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by normalthings »

earthling wrote: Sun Jul 26, 2020 2:37 pm Anyone have downtown occupancy numbers? I could only find River/Crown/Plaza for last quarter from Cushman and RCP was near 95%. Quite good but not better than metro avg.
Around 94.3% for Metro in May
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by normalthings »

normalthings wrote: Sun Jul 26, 2020 2:17 pm July 2020: 15 of 126 open units. 88% full per the Arterra leasing portal. https://arterraapts.prospectportal.com/ ... y/arterra/

Apartments.Com has the building at 93% leased.
Up to 90% now.
User avatar
Chris Stritzel
Penntower
Penntower
Posts: 2294
Joined: Sun Feb 19, 2017 9:27 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by Chris Stritzel »

normalthings wrote: Wed Sep 02, 2020 1:40 am
normalthings wrote: Sun Jul 26, 2020 2:17 pm July 2020: 15 of 126 open units. 88% full per the Arterra leasing portal. https://arterraapts.prospectportal.com/ ... y/arterra/

Apartments.Com has the building at 93% leased.
Up to 90% now.
24 apartments of 126 are available according to apartments.com. 81% leased. An additional 11 apartments become available throughout December (2) and January (9).
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by normalthings »

Chris Stritzel wrote: Wed Nov 18, 2020 2:57 am
normalthings wrote: Wed Sep 02, 2020 1:40 am
normalthings wrote: Sun Jul 26, 2020 2:17 pm July 2020: 15 of 126 open units. 88% full per the Arterra leasing portal. https://arterraapts.prospectportal.com/ ... y/arterra/

Apartments.Com has the building at 93% leased.
Up to 90% now.
24 apartments of 126 are available according to apartments.com. 81% leased. An additional 11 apartments become available throughout December (2) and January (9).
The Arterra leasing portal shows 15 open.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by normalthings »

7 of 126 available. 94.4% leased.
User avatar
normalthings
Mark Twain Tower
Mark Twain Tower
Posts: 8018
Joined: Mon Mar 30, 2015 9:52 pm

Re: OFFICIAL - ARTerra (21st and Wyandotte)

Post by normalthings »

normalthings wrote: Tue Apr 13, 2021 7:47 pm 7 of 126 available. 94.4% leased.
6 of 126 available. 95.2% leased
Post Reply